Laserfiche WebLink
must be reimbursed by the applicant before the permit <br />can be issued. <br />Residential, Commercial, Industrial, Institutional <br />$5,400 non-refundable fee due at time of application. <br />development that proposes 5 or more acres of new <br />Once application review costs (District Engineer and <br />and/or reconstructed impervious surface <br />Legal Counsel) exceed $9,000*, any additional cost <br />must be reimbursed by the applicant before the permit <br />can be issued. <br />Notes: An application subject to a Rule C fee is exempt from the Non -Rule C fee of $300. <br />The following is exempt from the Rule C fee and subject to only the Non -Rule C fee of $300: Single-family <br />residential subdivision that creates seven or fewer lots and establishes no new public roadway or a private <br />roadway/drivewayroadway/driveway serving three or more lots <br />Non -Rule C Fee: A $300 non-refundable fee is due at the time of application for a project subject to one or <br />more of the following Rules: <br />Rule D (Erosion and Sediment Control Plans) <br />Rule E (Floodplain Alteration) <br />Rule F (Wetland Alteration) <br />Rule G (Regional Conveyance Systems) <br />Rule I (Public Drainage Systems) <br />Rule J (Appropriation of Public Waters <br />_ <br />Rule L (Variances): Variable. See District Permit Variance Guidance Policy <br />* Review cost is calculated according to the consultant hourly rate, which the District will publish annually. The <br />review cost incurred between the non-refundable fee amount and $9,000 will be absorbed by the District and <br />will not be the responsibility of the applicant. District staff will notify the applicant of the incurred cost to date <br />once the total review cost exceeds $7,500, and at subsequent $3,000 intervals. A delay in notice, however, will <br />not affect the applicant's reimbursement responsibility <br />Storm Water Connection/Re air/Disconnect $100 plus surcharge <br />Storm Water Inspection or re -inspection after Call -out rate per visit (Minimum 2 hours) <br />hours <br />Street Lighting Utility Fees Title XV,-Chapter 152.018 <br />Residential (single family homes, duplexes, $4 a9 5.00 per unit per quarter <br />four lexes, condominium and townhomes <br />Commercial/Industrial <br />$24-09 $23.41 per acre per quarter <br />Institutional/Charitable $24-9-9 $23.41 per acre per quarter <br />Apartments $24-.G9 $23.41 per acre per quarter <br />Construction Site and Land Disturbance Fees (Title XV, Chapter 156.006) Additional Fees May be <br />Required for Legal and Engineering Costs Incurred by the City. <br />50 Cubic Yards or Less $25 <br />51 to 100 Cubic Yards $50 <br />101 to 1,000 Cubic Yards $50 base fee plus $20 for each 100 cubic yards or fraction <br />thereof <br />1,001 to 10,000 Cubic Yards <br />$250 base fee plus $35 for each 1,000 cubic yards or <br />fraction thereof <br />10,001 to 100,000 Cubic Yards <br />$500 base fee plus $100 for each 10,000 cubic yards or <br />fraction thereof <br />$1,500 base fee plus $250 for each 100,000 cubic yards <br />100,001 Cubic Yards or More <br />or fraction thereof <br />_ <br />Other Miscellaneous Public Works Fees <br />$125 per trip <br />Load Limit Waiver (Must be authorized by the <br />Public Works Director <br />Call -Out Charge for Contractor Negligence (Lack <br />Call -out rate per visit (Minimum 2 hours) plus cost(s)* of <br />of Maintenance, Traffic Signs, Etc.) <br />any materials required to remedy the issue. *TBD by the <br />Director of Public Works/Parks and Recreation <br />_ <br />Water Tower Telecommunications Maintenance or <br />No charge if during normal business hours, otherwise 2 <br />Repair Access Fee <br />hour minimum charge for each after hours call -out <br />2024 Mounds View Fee Schedule Page 14 of 15 <br />