My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1012
MoundsView
>
Commissions
>
City Council
>
Ordinances
>
2020-2029
>
2023
>
Ordinance 1012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 10:17:42 AM
Creation date
11/15/2023 10:51:52 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Ordinances
MEETINGDATE
11/13/2023
Commission Doc Number (Ord & Res)
1012
Supplemental fields
City Council Document Type
Ordinances
Date
11/13/2023
Resolution/Ordinance Number
1012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Patio/Deck 30" and under, or not attached �_ $30 f <br />Driveways, Sidewalks, Parking Lots, Patios (no permit required for sealcoating or overlays without expansion). <br />A right-of-way permit is required for any construction that disrupts City -owned streets, curbing, sidewalks, etc., <br />residential includes churches and schools. <br />Residential R-1 or R-2 Driveway $45 <br />Residential R-3, R-4 and R-5 Driveway or Parkin Lot $75 <br />Residential Gravel refer to Zoning Code for limitations $125 <br />Commercial/Industrial Driveway or Parkin Lot $1150 <br />Commercial/Industrial Sidewalk or Patio $75 <br />Fence/Kennel — 7' or below (if higher, Building Permit, see <br />$30 <br />Appendix A) <br />$30 <br />Retaining Wall — 4' or below (if higher, Building Permit, see <br />Appendix A <br />Shed 200 square feet or less <br />$30 <br />Si ns — Billboards(Building Permit <br />See A2pendix A <br />Signs (Chapter 1008 up to 100 square feet <br />$75 <br />Signs 100 square feet or over <br />$95 <br />Signs — Re -Facing or Altering <br />$40 <br />Signs, Banners — Temporary <br />$40 per 21-day period (Limit 4 permits per year <br />plus one additional permit for a banner) <br />Swimming Pools, Residential Above Ground) <br />$30 <br />See Appendix A (Surcharge Required) <br />Swimming Pools (In -Ground, Building Permit) <br />II. OTHER INSPECTION / PLANNING FEES <br />Applicants are responsible for all costs incurred associated with the filing, review and processing of <br />development applications. Such fees to be paid in escrow up front or upon receipt of statement from the City of <br />Mounds View. Fees may include, but are not limited to, costs for consultants retained by the City, consultant <br />planning services, attorney, and engineer fees. A deposit may also be required to cover costs of public notices, <br />materials and staff time spent in the review, research or preparation of materials associated with each <br />application. The applicant shall be responsible for all reasonable incurred costs in excess of the initial fee <br />and/or deposit amount. Any portion of the deposit not spent or encumbered shall be refunded to the applicant <br />within 30 days after consideration of the application is completed. Payment of park dedication fees is required <br />with subdivision applications. Application fees are not refundable. <br />Building Inspections Conducted Outside Normal Business $63.25/hour (two-hour minimum charge) <br />Hours <br />Change of Address $150 <br />Change of Occupancy $75 <br />Comprehensive Plan Amendment <br />$500 <br />Conditional Use Permit, R-1 or R-2 <br />$400 <br />Conditional Use Permit, All Other Districts <br />$400 <br />Conditional Use Permit Amendment <br />Same as CUP Fee <br />Contractor License Title XV, Chapter 150.053 <br />$60 <br />Contractor State License Verification Fee <br />$5 per permit <br />Development/Site Plan Review <br />$400 <br />Escrow — Manufactured Homes <br />$500 per permit <br />Escrow — Occupancy (Seed, sod, landscaping; as -building <br />$1,000 for each item <br />grading survey; driveway installation; curb cut <br />modifications; site clean-up; storm water management; <br />drainage features; site erosion; right-of-way restoration; or <br />any other items as determined by the Building Official) <br />Housing Inspection Initial and One Follow -Up (includes <br />No Charge (Title XI, Chapter 119) <br />now shows) <br />Housing Inspection/No Show, each additional <br />$100 <br />Interim Use Permit (IUP) <br />$400 <br />IUP Amendment <br />$400 <br />2024 Mounds View Fee Schedule Page 4 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.