Laserfiche WebLink
MOUNDS!_VIEW Trailways System Master Plan—DRAFT 9C <br /> Quincy Street SU • Connects Oakwood and Greenfield Parks, Status:Striped 6-10' lanes, both sides,from MV BLVD to <br /> Pinewood Elementary and industrial park Hillview Rd. Concrete sidewalk, on east side,from Hillview <br /> Rd to CR H2. MSA route along majority of length <br /> Gap:No sidewalk from MV BLVD to CR H2 <br /> Plan:Future implementation of sidewalk with local street <br /> project. Proposed sidewalk along east side of Quincy St <br /> from CR H2 to MV BLVD. <br /> 'a- otic'14- +� .. - t <br /> .y, 4 .A , r ..,,.,t • 1 <br /> tkrt, . s 6 n m , _ _ . — <br /> .-,. 1, <br /> r O <br /> A. aI ib <br /> Old Hwy 8 SU • Connects CR H to New Brighton trailway Status: Concrete sidewalk,west side,from CR H to south <br /> to Long Lake Park boarder <br /> Gap:NA <br /> Plan:Maintain <br /> Knollwood Dr WW • Connects from CR H to CR H2 Status: NA <br /> Gap:No controlled walkway to connect neighborhood to <br /> existing pedestrian system <br /> Plan:Proposed sidewalk along east side of Knollwood Dr <br /> from CR H to CR H2 <br /> 44-0 <br /> ' <br /> Y <br /> i1 <br /> 4 <br /> 12 <br />