My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-25-2024 PRF Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2020-2029
>
2024
>
01-25-2024 PRF Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 3:22:28 PM
Creation date
1/30/2024 1:41:22 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MOUNDtEW Trailways System Master Plan— DRAFT 9C <br /> Co Rd H2 SU • Full East/West route:Connects Silver View Status:Asphalt 8'trail north side,from west end across MV BLVD and concrete <br /> Park and through industrial park sidewalk on north side from MV BLVD to Jackson Dr. Continues as 6-8'striped <br /> • Connection to Fridley trailways lane, both sides,to connection with Program Ave. MSA route along majority of <br /> length <br /> Gaps:No walkway on south side between Silver Lake Rd and Long Lake Rd. Bikes <br /> must use north side trail way. No controlled walking feature from Jackson Dr to <br /> existing sidewalk on Quincy St. <br /> Plan:Proposed sidewalk from Silver Lake Rd to Long Lake Rd along south side of <br /> CR H2 and proposed sidewalk along north side from Jackson Dr to Program Ave. <br /> f'/ <br /> iy ''' . s* 4` <br /> f, `_ <br /> 1 ^� �-...._.�..�.. _ ..—�._,.. COUNTY ROM TRW ' ".,""n.w} <br /> r a <br /> P Y p y <br /> g <br /> w t <br /> a <br /> . h � <br /> COURT'ROAD 417 W a <br /> ♦.y <br /> Co Rd H SU • Full East/West route:Connection to Edgewood Status:Concrete sidewalk, north side,from west end to Silver Lake Rd. Sidewalk <br /> MS, Irondale HS,Sunnyside Elementary continues,south(New Brighton)side,from Silver Lake Rd to Edgewood Dr,then <br /> • Connection to Rice Creek,TCAAP and Fridley transitions to paved trailway to Old Hwy 8 <br /> trailways Gap:No north side walkway from Silver Lake Rd to Edgewood Dr. <br /> Plan:Implement needed features with local street and Co Rd H and MV BLVD <br /> intersection projects. Proposed sidewalk along north side from Silver Lake Rd to 1 <br /> Edgewood Dr. The school district would need to initiate the applications for grants <br /> to fund construction through the state or federal Safe Routes to School Programs. <br /> 'ti+ 2 .0) t'* 1 .., <br /> ...it - 1 ' _, g , . - ^ 5 ' ..• • g - -1" il •'go g <br /> x j` <br /> =J j <br /> i y # <br /> t IP .• ' 1 : 1 '; ,. ..':°' 1a a <br /> i <br /> r <br /> _ <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.