Laserfiche WebLink
MOUNDSVIEW Trailways System Master Plan—DRAFT 9C <br /> Detailed Plan - Continued <br /> Prior <br /> Park Trailways Use -ity Connecting Landmarks and Trailways Status—Gaps-Plans <br /> Silver View Park SU • Connects with Long Lake Rd, Silver Lake Rd,CR Status:Complete—Paved <br /> H and I trailways Gap:From County Road 1 into Park—pedestrians must use driveway/road to <br /> access park facilities <br /> Plan:Proposed trail to connect CR I sidewalk to existing trail system, dugout, <br /> volleyball court, and basketball court for ADA compliance. <br /> C),* <br /> a a r o t s s s e s IO•NIa <br /> • <br /> 11 <br /> s <br /> • <br /> •s <br /> •..,•_•se:..r... <br /> . <br /> ft•s.•....., <br /> *iie <br /> a ft <br /> +! <br /> 0 <br /> Greenfield Park WW • Connects with Hillview Rd and Quincy St Status:Trail way is a mix of paved and gravel <br /> trailways and Oakwood Park Gap:Gravel portions not conducive to biking. <br /> Plan:Maintain <br /> Ardan Park WW • Connect with Long Lake Rd and Arden Ave Status:Walkway exists from Long Lake Road along sound wall,through park and <br /> trailways back to Long Lake Rd <br /> • Connection with Blaine trailway along CR J/ Gap:Improvements needed to encourage use <br /> 85th Ave Plan: Future improvement to gravel or implement paved walkway. Proposed trail <br /> connecting existing sidewalk on the intersection of Long Lake Rd and Eastwood Dr <br /> to Laport Dr <br /> 17 <br />