My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-26-2024 EDA
MoundsView
>
Commissions
>
Economic Development Authority
>
Agenda Packets
>
2020-2029
>
2024
>
02-26-2024 EDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 9:14:54 AM
Creation date
2/21/2024 10:37:40 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
Economic Development Authority
Commission Doc Type
Agenda Packets
MEETINGDATE
2/26/2024
Commission Doc Number (Ord & Res)
0
Supplemental fields
Date
2/26/2024
EDA Document Type
Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IELTERTECH I'M <br />Environmental Consulting & Contracting <br />2605 Seppala Blvd. www.sheltertechcorp,.corn <br />North St. Paul, MN 55109 fax: 651.773.8909 <br />651.770.2405 <br />PROPOSAL/CONTRACT #00224-2716-A <br />SUBMITTED TO: <br />City of Mounds View <br />Attn: Nick Henly <br />2401 Mounds View Boulevard <br />Mounds View, MN 55112 <br />RE: Asbestos Pre -Demo and Disposal, SF Residential Structure <br />2716 Hillview Road, Mounds View, MN 55112 <br />SHELTERTECH CORPORATION, Licensed and Insured Asbestos Abatement Contractor, proposes to <br />perform work at the above referenced property as specified below. <br />DESCRIPTION <br />OBTAIN MDH PERMIT; INSPECT AND PRE -CLEAN CONTAINMENT AREAS; INSTALL CRITICAL AIR BARRIERS AS REQUIRED; CONSTRUCT <br />WORK ENCLOSURES WITH ATTACHED DECONTAMINATION UNIT; ESTABLISH NEGATIVE AIR PRESSURE WITH HEPA-FILTERED <br />EXHAUST DUCTED TO BUILDING EXTERIOR; AFTER OBTAINING FINAL AIR CLEARANCE, REMOVE ENCLOSURES AND DISPOSE OF ACM. <br />REMOVE AND DISPOSE OF THE FOLLOWING ASBESTOS CONTAINING MATERIALS: <br />1. APPROX. 150 SF OF SHEET FLOORING FROM KITCHEN AND EAST ENTRY ON MAIN LEVEL <br />2. APPROX. 90 SF OF FLOOR TILE FROM DINING ROOM ON MAIN LEVEL <br />3. APPROX. 20 SF OF FLOOR TILE FROM THE NORTH ENTRY ON THE MAIN LEVEL <br />4. 35 SF OF WALL TILE ADHESIVE FROM THE BATHROOM. <br />5. APPROX. 18 STORM WINDOWS WITH ASBESTOS GLAZING <br />6. 4 SF OF CHIMNEY ROOF TAR FROM EXTERIOR <br />7. SINK UNDERCOATING FROM THE KICHEN <br />8. APPROX 160-400 SF OF BLACK WALL INSULATION ADHESIVE IN THE BASEMENT <br />♦ Project will be regulated by the MDH and requires a 5-day permit application period. <br />♦ All labor, materials, insurance, required permits, air monitoring, and disposal costs included. <br />♦ Abatement work to be conducted by personnel licensed by the Minnesota Department of Health. <br />♦ All ACBM removed from this project will be transported to an approved landfill for disposal. <br />PRICE: All of the work described above to be completed in a substantial and workmanlike manner <br />according to standard practices for the sum of Seven_ thousand three hundred sixty and 00/100 <br />Dollars ($7,360.00) <br />SUBMITTED on 02/05/2024 by <br />ACCEPTED on 20 by <br />SHELTERTECH CORPORATION is insured by Western National Insurance company <br />• SHELTERTECH CORPORATION is licensed by the State of Minnesota to perform abatement work under license #955. <br />
The URL can be used to link to this page
Your browser does not support the video tag.