Laserfiche WebLink
January 26,2024 <br /> Don Peterson <br /> Page 16 of 21 <br /> Reference: Water Quality Assessment of Silver View Pond,Mounds View,MN <br /> to a downstream depressional area, which then discharges through a large corrugated metal pipe to Silver <br /> View Pond. The secondary outlet will be filtration through the bench to a draintile which then discharges to <br /> the outlet control structure. A 10-foot wide emergency overflow notch will be graded into the existing <br /> overflow berm. Turf reinforcement matting will be added to the downslope down to the existing depressional <br /> area. <br /> 2 NWL 897.0 <br /> EL8960` /EL 896.0 <br /> _-''j ', <br /> `� <br /> EL 895.0 • .•.,.;:.•. . . .: EL 8946 <br /> \\\.c./..))..,..3 <br /> s 6"HDPE CORRUGATED <br /> \ /t J EL.892.0 PERFORATED DRAINTILE <br /> WITHOUT SOCK CD 0 D% <br /> GRADE <br /> INE FILTER MEDIA <br /> Figure 7. Forebay Improvements Cross Section. <br /> j <br /> • .,„____, .‘ ..,01) <br /> Figure 8. Forebay Improvements Plan. <br /> Design with community in mind <br />