Laserfiche WebLink
MOUND 'IEW Trailways System Master Plan DRAFT 7C <br /> Quincy Street SU • Connects Oakwood and Greenfield Parks, Status:Striped 6-10' lanes, both sides,from MV BLVD to <br /> Pinewood Elementary and industrial park Hillview Rd. Concrete sidewalk,on east side,from Hillview <br /> Rd to CR H2. MSA route along majority of length <br /> Gap:No sidewalk from MV BLVD to CR H2 <br /> Plan: Future implementation of sidewalk with local street <br /> project. Proposed sidewalk along east side of Quincy St <br /> from CR H2 to MV BLVD. <br /> i <br /> 4 <br /> / 4, i <br /> A <br /> : <br /> y <br /> fFp Y <br /> I/ <br /> o <br /> 0♦o v Y <br /> ti <br /> +$;• w ,yy�,� weiM ”wwa w w nwxa w wRww w ,o mt..•* <br /> Mw" q `v�„"� wwrw rr <br /> o <br /> wx*c B <br /> y <br /> y <br /> Y <br /> Y <br /> Y. <br /> , 4 E: <br /> , yyA�� <br /> vP' 0 <br /> Old Hwy 8 SU • Connects CR H to New Brighton trailway Status:Concrete sidewalk, west side,from CR H to south <br /> to Long Lake Park boarder <br /> Gap:NA <br /> l'laa"Maim, r.• <br /> Knollwood Dr WW • Connects from CR H to CR H2 Status: NA <br /> Gap:No controlled walkway to connect neighborhood to <br /> existing pedestrian system <br /> Plan Proposed sidewalk along east side of Knollwood Or <br /> '"+' " (RHtoLi?H2 <br /> . <br /> Twy w <br /> Y *` <br /> ht" <br /> ,§ : ya <br /> . � . ... <br /> 12 <br />