Laserfiche WebLink
MOUNDSIYIEW Trailways System Master Plan— DRAFT 7C <br /> Detailed Plan - Continued <br /> Prior <br /> Park Trailways Use -ity Connecting Landmarks and Trailways Status—Gaps- Plans <br /> Silver View Park SU • Connects with Long Lake Rd,Silver Lake Rd,CR Status:Complete—Paved <br /> H and I trailways Gap:From County Road I into Park—pedestrians must use driveway/road to <br /> access park facilities <br /> Plan:Proposed trail to connect(R I sidewalk to existing trail system, dugout, <br /> vnllr'ytall rrr,rt and basketball cowl. t r '11?A compliance <br /> • <br /> rassaa-assasssas• <br /> • <br /> '4.1'.**4■••••••00°C) <br /> i <br /> ••s•-ea.X-••#ft.�. <br /> 41•4646 a••• <br /> • •• <br /> ••ie <br /> •s <br /> • <br /> Greenfield Park WW • Connects with Hillview Rd and Quincy St Status:Trail way is a mix of paved and gravel <br /> trailways and Oakwood Park <br /> Gap:Gravel portions not conducive to biking. � <br /> Plan Maintain <br /> Ardan Park WW • Connect with Long Lake Rd and Arden Ave Status:Walkway exists from Long Lake Road along sound wall,through park and <br /> trailways back to Long Lake Rd <br /> • Connection with Blaine trailway along CR J/ Gap:Improvements needed to encourage use <br /> 85th Ave Plan: future improvement to gravel or implement paved walkway. Proposed[rail <br /> connecting existing sidewalk on the intersection of Long Lake Rd and Eastwood Dr <br /> to lanai Or <br /> 17 <br />