My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMMISSION_MINUTES_1989-08-24
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Minutes
>
1980-1989
>
1989
>
COMMISSION_MINUTES_1989-08-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2024 1:28:26 PM
Creation date
6/10/2024 1:28:26 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Packet
Supplemental fields
Date
9/28/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SILVER VIEW PARK <br />PATHWAY (CONVD) <br />.In <br />Mayor Hankner suggested that Sabri Ayaz be <br />contacted regarding bridge design as he had <br />offered his time in designing a bridge. She <br />added that she would like to see bushes <br />planted at the property corners this fall to <br />help delineate public versus private property. <br />Director Saarion stated that Forester Wriskey <br />had expressed concern that plantings may be <br />injured if planted before pathway installation. <br />However, it was clarified that these plantings <br />need only be inexpensive temporary plantings <br />to designate property corners. Forester <br />Wriskey has discretion to choose species and <br />location spacing. <br />Councilmember Quick asked staff to get a <br />bituminous bid per linear foot as well as the <br />total price. Commissioner Silvis requested the <br />cost estimate of ag lime with a fabric base as <br />well, 6 feet in width. Chairperson Burmeister <br />stated that it would be his preference that <br />should a bridge be installed he would still <br />want the pathway constructed. <br />Councilmember Quick suggested that cost <br />estimates should be 8 foot and 6 foot. <br />Chairperson Burmeister made a motion to <br />direct staff to get cost estimates on <br />construction of a 6 foot wide bituminous trail, <br />8 foot wide bituminous trail, 6 foot and 8 foot <br />ag-lime trail with fabric underlayment, and a <br />per linear foot cost estimate of bituminous <br />trail. Estimates should be done for both the <br />entire trail around the pond and the 750 foot <br />section on the south side of the pond alone. <br />Funding options for the project should include <br />re-accessment of the culvert installation and <br />possible use of such funds for installation of <br />the bituminous pathway. Motion was <br />seconded by Commissioner Starr. Motion <br />carried: 4 ayes, 0 nayes. <br />Commissioner Starr asked staff to bring cost <br />estimates, measurements, and wetlands <br />information regarding bridge installation to <br />the next commission meeting. <br />