Laserfiche WebLink
To: Public Works Director Greg Lee <br />From: .toe Rhein <br />Nathan Benson <br />Date: January 23, 2006 <br />Re: Random Park Building Replacement Project <br />Alternate Parking Lot Investigation <br />File No.: 435-05-11.7 <br />Bonestroo <br />® Rosene <br />"Anderfifc & <br />Associates <br />Engineers & Architects <br />As part of the project to relocate the clubhouse building from the former Bridges Golf Course to Random <br />Park, the parking lot at Random Park will be reconstructed. The current parking area at Random Park is <br />located west of the proposed building location, with entrance off of Long Lake Road. <br />During project development, the question arose regarding the possibility of relocating the parking lot for <br />Random Park such that it would be located south of the building, with the entrance off of Ridge Lane. <br />Following discussion on the subject, you directed that we investigate that option to see if it was feasible, <br />and compare it to the original design.. <br />We have performed the investigation as requested, and have found that the construction of a parking lot <br />with entrance off of Ridge Lane would be feasible, Included with this memo are the following documents <br />in support of the investigation: <br />• Site plan of original design, with entrance off' of Long Lake Road <br />• Site plan of alternate design, with entrance off of Ridge Lane <br />• Cost estimate comparison of the site improvements associated with both the original <br />design and alternate design <br />• Comparison table of the main components of the original design versus the alternate <br />design <br />Based on this information, it appears the following would be true: <br />• A total of 4 additional parking stalls can be readily achieved in the alternate location <br />• Construction of the parking lot at the alternate location would require less fill material <br />• Construction of the parking lot at the alternate location would result in less impact to the <br />flood plain, and therefore less associated mitigation <br />• Construction of the parking lot at the alternate location would require less storm sewer <br />• Construction of the parking lot at the alternate location would result in a lower total area <br />of the park being disturbed by the construction and grading. <br />• The cost of construction at the alternate location would be approximately equal to the <br />cost in the original location, even including the increased number of parking stalls.. <br />