My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Parking Lot Options memo and estimates 1-23-06
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2000-2009
>
2006
>
01-26-2006
>
Parking Lot Options memo and estimates 1-23-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2023 2:11:30 PM
Creation date
8/21/2024 2:58:54 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RANDOM PARK BUILDING REPLACEMENT PROJECT <br />PARKING LOT LOCATION COST ESTIMATE COMPARISON <br />ORIGINAL DESIGN (LONG LAKE ROAD ENTRANCE) <br />VS <br />ALTERNATE DESIGN (RIDGE LANE ENTRANCE) <br />CITY PROJECT NO. 2005-009 <br />FILE NO. 4,35-05-117 <br />SITE IMPROVEMENTS <br />Original Design <br />(Long Lake Road Entrance) <br />Alternate Design <br />(Ridge Lane Entrance) <br />No, Iter knits Unit Price <br />Qty Total Price <br />Qty Total Price <br />I <br />REMOVE BITUMINOUS PAVEMENT <br />SY <br />S5.00 <br />560 <br />$2,80000 <br />560 <br />S2,80000 <br />2 <br />REMOVE CONCRETE CURET AND <br />GUTTER <br />L F <br />S500 <br />30 <br />$15000 <br />10 <br />$5000 <br />3 <br />REMOVE 15" RCP STORM SEWER <br />PIPE <br />LF <br />S1500 <br />8 <br />$12000 <br />8 <br />$12000 <br />4 <br />REMOVE; DECIDUOUS SHRUB <br />EA <br />$8000 <br />8 <br />$640.00 <br />8 <br />$64000 <br />5 <br />REMOVE CONIFEROUS TREE <br />EA <br />$60000 <br />1 <br />$60000 <br />1 <br />$60000 <br />6 <br />GEOTEXTILEFABRIC, TYPE IV <br />SY <br />$250 <br />710 <br />$1,77500 <br />800 <br />52,00000 <br />7 <br />GRANULAR BORROW <br />TN <br />S l0 00 <br />390 <br />$3,90000 <br />375 <br />S3,75000 <br />8 <br />AGGREGATE BASE, CLASS 5 <br />TN <br />$1500 <br />305 <br />$4,57500 <br />325 <br />$4,87500 <br />9 B624 CONCRE'T'E CURB AND GUTTER L1.- <br />$2000 <br />0 <br />$000 <br />40 <br />$800.00 <br />10 <br />B612 CONCRETE CURB AND GUTTER <br />LF <br />S13.00 <br />395 <br />$5,13500 <br />370 <br />$4,91000 <br />I l <br />TYPE LV NON -WEARING COURSE <br />MIXTURE <br />TN <br />S6000 <br />75 <br />$4,50000 <br />84 <br />S5,04000 <br />12 <br />BITUMINOUS MATERIAL, I.OR TACK <br />COAT <br />GAL <br />S250 <br />30 <br />57500 <br />35 <br />$8750 <br />13 <br />TYPE LV WEARING COURSE <br />MIX`C URE <br />TN <br />$6500 <br />55 <br />S3,57500 <br />61 <br />$3,96500 <br />14 <br />4" SOL.ID LINE, YEL LOW EPDXY <br />LF <br />SI 00 <br />280 <br />$28000 <br />340 <br />534000 <br />15 <br />PAVEMENT MESSAGE, <br />14ANDICAPPED SYMBOL - EPDXY <br />EA <br />520000 <br />1 <br />520000 <br />1 <br />$20000 <br />16 <br />SIGN PANELS, TYPE C, HIGH <br />INTENSITY <br />SF <br />$10000 <br />625 <br />$62500 <br />625 <br />$62500 <br />17 <br />SIGN PANELS, TYPE C, ENGINEERING <br />GRADE <br />SF <br />$10000 <br />2 <br />$200.00 <br />2 <br />$200.00 <br />I8 <br />CONCRETE VALLEY GUTTER <br />SY <br />$50.00 <br />40 <br />$2,00000 <br />40 <br />S2,000 00 <br />19 <br />4" CONCRETE SIDEWALK <br />SY <br />$4200 <br />195 <br />$8,19000 <br />235 <br />$9,87000 <br />20 <br />6" THICK CONC WALK FOR <br />PEDESTRIAN CURB RAMP <br />SF <br />$600 <br />45 <br />S27000 <br />45 <br />S27000 <br />21 <br />TRUNCATED DOME PANEL <br />SF <br />545.00 <br />8 <br />$360.00 <br />8 <br />S36000 <br />22 <br />SALVAGE AND REINSTALL. RCP <br />APRON <br />EA <br />$600001 <br />1 <br />$60000 <br />1 <br />5600 00 <br />000435.05117.0 00410-I COST ESTIMATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.