Laserfiche WebLink
ROW <br />0 23 50 <br />Scala inScela in fe® <br />GENERAL EROSION CONTROL NOTES: <br />r SILT FENCE J <br />J—HOOK <br />\ CONSTRUCTION <br />\ LIMIT <br />i <br />ALL EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO ANY REMOVAL WORK AND/OR <br />DISTURBING ACTIVITIES SHALL BE MAINTAINED UNTIL THE POTENTIAL FOR EROSION HAS BEEN <br />ELIMINATED. <br />1. EXPOSED SOILS WILL BE STABILIZED WITHIN 3 TO 7 DAYS OF INACTIVITY, DEPENDING ON THE <br />SLOPE OF THESE AREAS, AND IF THEY HAVE A POSITIVE GRADE TOWARDS A SURFACE WATER <br />WITHIN 200 LINEAL FEET. <br />—SLOPES 1:3 OR > MUST BE STABILIZED WITHIN 3 DAYS <br />—SLOPES LESS THAN 1:3 MUST BE STABILIZED WITHIN 7 DAYS <br />—SOME INSTANCES MAY REQUIRE STABILIZATION TO OCCUR MORE THAN ONCE DURING <br />ROUGH GRADING <br />—WORK IN DRAINAGE SWALES OR THE NWP OF ANY SURFACE WATER WILL REQUIRE <br />STABILIZATION WITHIN 24 HOURS. <br />—OUTLETS INTO SURFACE WATERS MUST BE STABILIZED WITH ENERGY DISSIPATION WITHIN 24 <br />HOURS. <br />2. ALL AREAS NOT BEING WORKED ON FOR A PERIOD GREATER THAN OR EQUAL TO 21 DAYS <br />SHALL HAVE TEMPORARY STABILIZATION APPLIED WITH THE APPROPRIATE MEANS TO PREVENT <br />SOIL LOSS. <br />3. NO AREAS ARE TO UNDERGO ANY SOIL DISTURBING ACTIVITIES BEFORE WORK BEGINS IN THE <br />AREA <br />4. CONTRACTOR IS RESPONSIBLE TO COMPLY WITH ALL REQUIREMENTS OF THE NPDES PHASE II <br />CONSTRUCTION GENERAL PERMIT PART IV — CONSTRUCTION ACTIVITY REQUIREMENTS. <br />5. SILT FENCE MUST BE LOCATED ON THE CONTOUR TO CAPTURE THE OVERLAND, LOW—VELOCITY <br />SHEET FLOW DOWNGRADIENT OF ALL EXPOSED SOILS AND PRIOR TO DISCHARGING TO SURFACE <br />WATERS, OR AFTER THE CONSTRUCTION OF THE PERMANENT STORM WATER MANAGEMENT <br />SYSTEMS WITH THE SILT FENCE J—HOOKED AT A MINIMUM OF 100 FOOT INTERVALS. <br />6. ALL STORM SEWER INLETS WILL BE PROTECTED FROM THE INTRUSION OF SEDIMENT USING <br />HEAVY DUTY SILT FENCE MNSOT 3886. <br />7. SEDIMENT DAMAGE FROM STOCKPILES SHALL BE MINIMIZED BY INCORPORATING THE FOLLOWING: <br />—A ROW OF SILT FENCE SHALL BE PLACED 5 FEET FROM THE TOE <br />—ALL STOCKPILES LEFT FOR A PERIOD OF 21 DAYS SHALL HAVE TEMPORARY STABILIZATION <br />B. STREET SURFACES MUST BE SWEPT VATHIN 24 HOURS OF DISCOVERY OF SEDIMENT OR <br />TRACKING. <br />_— _ _ =_ ✓ 132+00_ NSTR(!C ONS <br />L IT <br />�`3xTxO1 .` i'END <br />I 11 \ CONSTRUCTION <br />134+001 —�— — — <br />\ OW _ <br />SILT ! ✓ \ \ \ / �. ` _ — �.�._ _ — - <br />-FENS'/ <br />vk <br />C\\ LIMIT SILTNCE <br />\\\\\ \\ \ \\ <br />2559 <br />10. THE CONTRACTOR MUST COMPLY WITH THE REQUIREMENTS REGARDING POLLUTION <br />PREVENTION MANAGEMENT DURING CONSTRUCTION WHERE STAGING AREAS MUST BE VERIFIED <br />AT THE PRECONSTRUCTION MEETING, AND SHALL INCLUDE: <br />—CONCRETE WASHOUT AREAS <br />—SOLID WASTE COLLECTION AND DISPOSAL <br />—TRAILER PARKING <br />—SECONDARY CONTAINMENT <br />—HAZARDOUS WASTE STORAGE CONTAINERS AND SPILL KITS <br />—EXTERNAL WASHING OF TRUCKS MUST BE DONE IN A DEFINED AREAS WITH THE RUNOFF <br />CONTAINED AND PROPERLY DISPOSED <br />11. MAINTENANCE OF EROSION AND SEDIMENT CONTROL BMPS SHOULD BE COMPLETED AS <br />OUTLINED BELOW: <br />—SILT FENCE REPAIRS SHOULD BE MADE WITHIN 24 HOURS OF DISCOVERY WHEN IT <br />BECOMES NON—FUNCTIONAL OR SEDIMENT REACHES 1/3 THE HEIGHT OF THE FENCE <br />—INLET PROTECTION DEVICES SHOULD BE REPAIRED WHEN THEY BECOME NON—FUNCTIONAL <br />OR SEDIMENT REACHES 1/3 THE HEIGHT AND/OR DEPTH OF THE DEVICE <br />—TRACKED SEDIMENT MUST BE REMOVED WITHIN 24 HOURS OF DISCOVERY OF OFF SITE <br />TRACKING ONTO PAVED SURFACES. <br />—CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL BMPS UNTIL WORK HAS BEEN <br />COMPLETED. SITE HAS GONE UNDER FINAL STABILIZATION, AND THE NOTICE OF <br />TERMINATION HAS BEEN SUBMITTED TO THE MPCA OR THE SITE HAS TRANSFERRED <br />OWNERSHIP IN ACCORDANCE WITH PART II.B.5 OF THE CONSTRUCTION GENERAL PERMIT. <br />b � <br />ymm <br />u;N$m <br />b <br />S Z ti b <br />6am.�e <br />3aa <br />y M:nsLL <br />N 6 <br />g„Yu-� <br />vvv��� <br />C VI V tin a1 <br />0�7CQQ C$ <br />Mpgt <br />a� <br />O <br />33 3 <br />z c, <br />J <br />z � <br />??T Z z <br />W W o <br />LLLUUU <br />mo <br />i W o <br />OD rn <br />0 W <br />ZJ> <br />~ a <br />O M <br />Fw <br />Opo <br />O <br />D <br />0 <br />U z o <br />Z) U <br />O <br />O <br />20 OF 44 <br />914— <br />10 <br />-------- <br />_COUNV-�RQ,A.- <br />129+46, 13.5' LT <br />;/ _ / X, <br />EL.91� <br />/ <br />130+25, 15' LT <br />CONSTRUCTION <br />LIMIT <br />EL. 917.5 <br />ROW <br />0 23 50 <br />Scala inScela in fe® <br />GENERAL EROSION CONTROL NOTES: <br />r SILT FENCE J <br />J—HOOK <br />\ CONSTRUCTION <br />\ LIMIT <br />i <br />ALL EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO ANY REMOVAL WORK AND/OR <br />DISTURBING ACTIVITIES SHALL BE MAINTAINED UNTIL THE POTENTIAL FOR EROSION HAS BEEN <br />ELIMINATED. <br />1. EXPOSED SOILS WILL BE STABILIZED WITHIN 3 TO 7 DAYS OF INACTIVITY, DEPENDING ON THE <br />SLOPE OF THESE AREAS, AND IF THEY HAVE A POSITIVE GRADE TOWARDS A SURFACE WATER <br />WITHIN 200 LINEAL FEET. <br />—SLOPES 1:3 OR > MUST BE STABILIZED WITHIN 3 DAYS <br />—SLOPES LESS THAN 1:3 MUST BE STABILIZED WITHIN 7 DAYS <br />—SOME INSTANCES MAY REQUIRE STABILIZATION TO OCCUR MORE THAN ONCE DURING <br />ROUGH GRADING <br />—WORK IN DRAINAGE SWALES OR THE NWP OF ANY SURFACE WATER WILL REQUIRE <br />STABILIZATION WITHIN 24 HOURS. <br />—OUTLETS INTO SURFACE WATERS MUST BE STABILIZED WITH ENERGY DISSIPATION WITHIN 24 <br />HOURS. <br />2. ALL AREAS NOT BEING WORKED ON FOR A PERIOD GREATER THAN OR EQUAL TO 21 DAYS <br />SHALL HAVE TEMPORARY STABILIZATION APPLIED WITH THE APPROPRIATE MEANS TO PREVENT <br />SOIL LOSS. <br />3. NO AREAS ARE TO UNDERGO ANY SOIL DISTURBING ACTIVITIES BEFORE WORK BEGINS IN THE <br />AREA <br />4. CONTRACTOR IS RESPONSIBLE TO COMPLY WITH ALL REQUIREMENTS OF THE NPDES PHASE II <br />CONSTRUCTION GENERAL PERMIT PART IV — CONSTRUCTION ACTIVITY REQUIREMENTS. <br />5. SILT FENCE MUST BE LOCATED ON THE CONTOUR TO CAPTURE THE OVERLAND, LOW—VELOCITY <br />SHEET FLOW DOWNGRADIENT OF ALL EXPOSED SOILS AND PRIOR TO DISCHARGING TO SURFACE <br />WATERS, OR AFTER THE CONSTRUCTION OF THE PERMANENT STORM WATER MANAGEMENT <br />SYSTEMS WITH THE SILT FENCE J—HOOKED AT A MINIMUM OF 100 FOOT INTERVALS. <br />6. ALL STORM SEWER INLETS WILL BE PROTECTED FROM THE INTRUSION OF SEDIMENT USING <br />HEAVY DUTY SILT FENCE MNSOT 3886. <br />7. SEDIMENT DAMAGE FROM STOCKPILES SHALL BE MINIMIZED BY INCORPORATING THE FOLLOWING: <br />—A ROW OF SILT FENCE SHALL BE PLACED 5 FEET FROM THE TOE <br />—ALL STOCKPILES LEFT FOR A PERIOD OF 21 DAYS SHALL HAVE TEMPORARY STABILIZATION <br />B. STREET SURFACES MUST BE SWEPT VATHIN 24 HOURS OF DISCOVERY OF SEDIMENT OR <br />TRACKING. <br />_— _ _ =_ ✓ 132+00_ NSTR(!C ONS <br />L IT <br />�`3xTxO1 .` i'END <br />I 11 \ CONSTRUCTION <br />134+001 —�— — — <br />\ OW _ <br />SILT ! ✓ \ \ \ / �. ` _ — �.�._ _ — - <br />-FENS'/ <br />vk <br />C\\ LIMIT SILTNCE <br />\\\\\ \\ \ \\ <br />2559 <br />10. THE CONTRACTOR MUST COMPLY WITH THE REQUIREMENTS REGARDING POLLUTION <br />PREVENTION MANAGEMENT DURING CONSTRUCTION WHERE STAGING AREAS MUST BE VERIFIED <br />AT THE PRECONSTRUCTION MEETING, AND SHALL INCLUDE: <br />—CONCRETE WASHOUT AREAS <br />—SOLID WASTE COLLECTION AND DISPOSAL <br />—TRAILER PARKING <br />—SECONDARY CONTAINMENT <br />—HAZARDOUS WASTE STORAGE CONTAINERS AND SPILL KITS <br />—EXTERNAL WASHING OF TRUCKS MUST BE DONE IN A DEFINED AREAS WITH THE RUNOFF <br />CONTAINED AND PROPERLY DISPOSED <br />11. MAINTENANCE OF EROSION AND SEDIMENT CONTROL BMPS SHOULD BE COMPLETED AS <br />OUTLINED BELOW: <br />—SILT FENCE REPAIRS SHOULD BE MADE WITHIN 24 HOURS OF DISCOVERY WHEN IT <br />BECOMES NON—FUNCTIONAL OR SEDIMENT REACHES 1/3 THE HEIGHT OF THE FENCE <br />—INLET PROTECTION DEVICES SHOULD BE REPAIRED WHEN THEY BECOME NON—FUNCTIONAL <br />OR SEDIMENT REACHES 1/3 THE HEIGHT AND/OR DEPTH OF THE DEVICE <br />—TRACKED SEDIMENT MUST BE REMOVED WITHIN 24 HOURS OF DISCOVERY OF OFF SITE <br />TRACKING ONTO PAVED SURFACES. <br />—CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL BMPS UNTIL WORK HAS BEEN <br />COMPLETED. SITE HAS GONE UNDER FINAL STABILIZATION, AND THE NOTICE OF <br />TERMINATION HAS BEEN SUBMITTED TO THE MPCA OR THE SITE HAS TRANSFERRED <br />OWNERSHIP IN ACCORDANCE WITH PART II.B.5 OF THE CONSTRUCTION GENERAL PERMIT. <br />b � <br />ymm <br />u;N$m <br />b <br />S Z ti b <br />6am.�e <br />3aa <br />y M:nsLL <br />N 6 <br />g„Yu-� <br />vvv��� <br />C VI V tin a1 <br />0�7CQQ C$ <br />Mpgt <br />a� <br />O <br />33 3 <br />z c, <br />J <br />z � <br />??T Z z <br />W W o <br />LLLUUU <br />mo <br />i W o <br />OD rn <br />0 W <br />ZJ> <br />~ a <br />O M <br />Fw <br />Opo <br />O <br />D <br />0 <br />U z o <br />Z) U <br />O <br />O <br />20 OF 44 <br />