My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trailway 9-10_plan set_draft_2006-12-18
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2000-2009
>
2006
>
12-21-2006
>
Plans - 95%
>
Trailway 9-10_plan set_draft_2006-12-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2023 2:21:35 PM
Creation date
8/21/2024 3:03:31 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ROW <br />GENERAL EROSION CONTROL NOTES: <br />i_ <br />SILT FENCE J <br />J -HOOK <br />\ CONSTRUCTION <br />\ LIMIT <br />ALL EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO ANY REMOVAL WORK AND/OR <br />DISTURBING ACTIVITIES SHALL BE MAINTAINED UNTIL THE POTENTIAL FOR EROSION HAS BEEN <br />ELIMINATED. <br />1. EXPOSED SOILS PALL BE STABILIZED WITHIN 3 TO 7 DAYS OF INACTIVITY, DEPENDING ON THE <br />SLOPE OF THESE AREAS, AND IF THEY HAVE A POSITIVE GRADE TOWARDS A SURFACE WATER <br />WITHIN 200 LINEAL FEET. <br />-SLOPES 1:3 OR > MUST BE STABILIZED WITHIN 3 DAYS <br />-SLOPES LESS THAN 1:3 MUST BE STABILIZED WITHIN 7 DAYS <br />-SOME INSTANCES MAY REQUIRE STABILIZATION TO OCCUR MORE THAN ONCE DURING <br />ROUGH GRADING <br />-WORK IN DRAINAGE SWALES OR THE NWP OF ANY SURFACE WATER WILL REQUIRE <br />STABILIZATION WITHIN 24 HOURS. <br />-OUTLETS INTO SURFACE WATERS MUST BE STABILIZED WITH ENERGY DISSIPATION WITHIN 24 <br />HOURS. <br />2. ALL AREAS NOT BEING WORKED ON FOR A PERIOD GREATER THAN OR EQUAL TO 21 DAYS <br />SHALL HAVE TEMPORARY STABILIZATION APPLIED WITH THE APPROPRIATE MEANS TO PREVENT <br />SOIL LOSS. <br />3. NO AREAS ARE TO UNDERGO ANY SOIL DISTURBING ACTIVITIES BEFORE WORK BEGINS IN THE <br />AREA <br />4. CONTRACTOR IS RESPONSIBLE TO COMPLY WITH ALL REQUIREMENTS OF THE NPDES PHASE II <br />CONSTRUCTION GENERAL PERMIT PART IV - CONSTRUCTION ACTIVITY REQUIREMENTS. <br />5. SILT FENCE MUST BE LOCATED ON THE CONTOUR TO CAPTURE THE OVERLAND, LOW-VELOCITY <br />SHEET FLOW DOWNGRADIENT OF ALL EXPOSED SOILS AND PRIOR TO DISCHARGING TO SURFACE <br />WATERS, OR AFTER THE CONSTRUCTION OF THE PERMANENT STORM WATER MANAGEMENT <br />SYSTEMS WITH THE SILT FENCE J -HOOKED AT A MINIMUM OF 100 F00T INTERVALS. <br />6. ALL STORM SEWER INLETS WILL BE PROTECTED FROM THE INTRUSION OF SEDIMENT USING <br />HEAVY DUTY SILT FENCE MNSOT 3886. <br />7. SEDIMENT DAMAGE FROM STOCKPILES SHALL BE MINIMIZED BY INCORPORATING THE FOLLOWING: <br />-A ROW OF SILT FENCE SHALL BE PLACED 5 FEET FROM THE TOE <br />-ALL STOCKPILES LEFT FOR A PERIOD OF 21 DAYS SHALL HAVE TEMPORARY STABILIZATION <br />8. STREET SURFACES MUST BE SWEPT WITHIN 24 HOURS OF DISCOVERY OF SEDIMENT OR <br />TRACKING. <br />132+00�CONSTROCTION <br />/ <br />LIMIT <br />c� <br />END <br />+CONSTRUCTION <br />134+O01 , <br />---ROW— <br />SILT <br />21 <br />CE <br />- - - T�-- <br />\ O TRUCThON J �.L f <br />\\\O <br />^ G NS <br />Zli / \\ <br />LIMIT <br />'IFENCE� <br />2559 <br />10. THE CONTRACTOR MUST COMPLY WITH THE REQUIREMENTS REGARDING POLLUTION <br />PREVENTION MANAGEMENT DURING CONSTRUCTION WHERE STAGING AREAS MUST BE VERIFIED <br />AT THE PRECONSTRUCTION MEETING, AND SHALL INCLUDE: <br />-CONCRETE WASHOUT AREAS <br />-SOLID WASTE COLLECTION AND DISPOSAL <br />-TRAILER PARKING <br />-SECONDARY CONTAINMENT <br />-HAZARDOUS WASTE STORAGE CONTAINERS AND SPILL KITS <br />-EXTERNAL WASHING OF TRUCKS MUST BE DONE IN A DEFINED AREAS WITH THE RUNOFF <br />CONTAINED AND PROPERLY DISPOSED <br />11. MAINTENANCE OF EROSION AND SEDIMENT CONTROL BMPS SHOULD BE COMPLETED AS <br />OUTLINED BELOW: <br />-SILT FENCE REPAIRS SHOULD BE MADE WITHIN 24 HOURS OF DISCOVERY WHEN IT <br />BECOMES NON-FUNCTIONAL OR SEDIMENT REACHES 1/3 THE HEIGHT OF THE FENCE <br />-INLET PROTECTION DEVICES SHOULD BE REPAIRED WHEN THEY BECOME NON-FUNCTIONAL <br />OR SEDIMENT REACHES 1/3 THE HEIGHT AND/OR DEPTH OF THE DEVICE <br />-TRACKED SEDIMENT MUST BE REMOVED WITHIN 24 HOURS OF DISCOVERY OF OFF SITE <br />TRACKING ONTO PAVED SURFACES. <br />-CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL BMPS UNTIL WORK HAS BEEN <br />COMPLETED, SITE HAS GONE UNDER FINAL STABILIZATION, AND THE NOTICE OF <br />TERMINATION HAS BEEN SUBMITTED TO THE MPCA OR THE SITE HAS TRANSFERRED <br />OWNERSHIP IN ACCORDANCE WITH PART 11.8.5 OF THE CONSTRUCTION GENERAL PERMIT. <br />O a1 e <br />vvv0 <br />�u b <br />co < C <br />O <br />33 5 <br />cZ�a <br />i 0 <br />O <br />F <br />Z Z <br />W O <br />m U <br />W 0 <br />1n Us <br />(n O <br />Q I w <br />Z _j <br />Q � <br />0 O <br />CL <br />O w <br />LL F <br />000 <br />O <br />� 7 <br />O <br />U z o <br />D 0 <br />O <br />U <br />43WSI <br />2Q OF 44 <br />� _ �. <br />gJ9� <br />i <br />— — 129+46, 13.5 LT <br />EL. 916 <br />CONSTRUCTION <br />130+25, 15' LT <br />a - <br />LIMIT <br />EL. 917.5 <br />i <br />ROW <br />GENERAL EROSION CONTROL NOTES: <br />i_ <br />SILT FENCE J <br />J -HOOK <br />\ CONSTRUCTION <br />\ LIMIT <br />ALL EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO ANY REMOVAL WORK AND/OR <br />DISTURBING ACTIVITIES SHALL BE MAINTAINED UNTIL THE POTENTIAL FOR EROSION HAS BEEN <br />ELIMINATED. <br />1. EXPOSED SOILS PALL BE STABILIZED WITHIN 3 TO 7 DAYS OF INACTIVITY, DEPENDING ON THE <br />SLOPE OF THESE AREAS, AND IF THEY HAVE A POSITIVE GRADE TOWARDS A SURFACE WATER <br />WITHIN 200 LINEAL FEET. <br />-SLOPES 1:3 OR > MUST BE STABILIZED WITHIN 3 DAYS <br />-SLOPES LESS THAN 1:3 MUST BE STABILIZED WITHIN 7 DAYS <br />-SOME INSTANCES MAY REQUIRE STABILIZATION TO OCCUR MORE THAN ONCE DURING <br />ROUGH GRADING <br />-WORK IN DRAINAGE SWALES OR THE NWP OF ANY SURFACE WATER WILL REQUIRE <br />STABILIZATION WITHIN 24 HOURS. <br />-OUTLETS INTO SURFACE WATERS MUST BE STABILIZED WITH ENERGY DISSIPATION WITHIN 24 <br />HOURS. <br />2. ALL AREAS NOT BEING WORKED ON FOR A PERIOD GREATER THAN OR EQUAL TO 21 DAYS <br />SHALL HAVE TEMPORARY STABILIZATION APPLIED WITH THE APPROPRIATE MEANS TO PREVENT <br />SOIL LOSS. <br />3. NO AREAS ARE TO UNDERGO ANY SOIL DISTURBING ACTIVITIES BEFORE WORK BEGINS IN THE <br />AREA <br />4. CONTRACTOR IS RESPONSIBLE TO COMPLY WITH ALL REQUIREMENTS OF THE NPDES PHASE II <br />CONSTRUCTION GENERAL PERMIT PART IV - CONSTRUCTION ACTIVITY REQUIREMENTS. <br />5. SILT FENCE MUST BE LOCATED ON THE CONTOUR TO CAPTURE THE OVERLAND, LOW-VELOCITY <br />SHEET FLOW DOWNGRADIENT OF ALL EXPOSED SOILS AND PRIOR TO DISCHARGING TO SURFACE <br />WATERS, OR AFTER THE CONSTRUCTION OF THE PERMANENT STORM WATER MANAGEMENT <br />SYSTEMS WITH THE SILT FENCE J -HOOKED AT A MINIMUM OF 100 F00T INTERVALS. <br />6. ALL STORM SEWER INLETS WILL BE PROTECTED FROM THE INTRUSION OF SEDIMENT USING <br />HEAVY DUTY SILT FENCE MNSOT 3886. <br />7. SEDIMENT DAMAGE FROM STOCKPILES SHALL BE MINIMIZED BY INCORPORATING THE FOLLOWING: <br />-A ROW OF SILT FENCE SHALL BE PLACED 5 FEET FROM THE TOE <br />-ALL STOCKPILES LEFT FOR A PERIOD OF 21 DAYS SHALL HAVE TEMPORARY STABILIZATION <br />8. STREET SURFACES MUST BE SWEPT WITHIN 24 HOURS OF DISCOVERY OF SEDIMENT OR <br />TRACKING. <br />132+00�CONSTROCTION <br />/ <br />LIMIT <br />c� <br />END <br />+CONSTRUCTION <br />134+O01 , <br />---ROW— <br />SILT <br />21 <br />CE <br />- - - T�-- <br />\ O TRUCThON J �.L f <br />\\\O <br />^ G NS <br />Zli / \\ <br />LIMIT <br />'IFENCE� <br />2559 <br />10. THE CONTRACTOR MUST COMPLY WITH THE REQUIREMENTS REGARDING POLLUTION <br />PREVENTION MANAGEMENT DURING CONSTRUCTION WHERE STAGING AREAS MUST BE VERIFIED <br />AT THE PRECONSTRUCTION MEETING, AND SHALL INCLUDE: <br />-CONCRETE WASHOUT AREAS <br />-SOLID WASTE COLLECTION AND DISPOSAL <br />-TRAILER PARKING <br />-SECONDARY CONTAINMENT <br />-HAZARDOUS WASTE STORAGE CONTAINERS AND SPILL KITS <br />-EXTERNAL WASHING OF TRUCKS MUST BE DONE IN A DEFINED AREAS WITH THE RUNOFF <br />CONTAINED AND PROPERLY DISPOSED <br />11. MAINTENANCE OF EROSION AND SEDIMENT CONTROL BMPS SHOULD BE COMPLETED AS <br />OUTLINED BELOW: <br />-SILT FENCE REPAIRS SHOULD BE MADE WITHIN 24 HOURS OF DISCOVERY WHEN IT <br />BECOMES NON-FUNCTIONAL OR SEDIMENT REACHES 1/3 THE HEIGHT OF THE FENCE <br />-INLET PROTECTION DEVICES SHOULD BE REPAIRED WHEN THEY BECOME NON-FUNCTIONAL <br />OR SEDIMENT REACHES 1/3 THE HEIGHT AND/OR DEPTH OF THE DEVICE <br />-TRACKED SEDIMENT MUST BE REMOVED WITHIN 24 HOURS OF DISCOVERY OF OFF SITE <br />TRACKING ONTO PAVED SURFACES. <br />-CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL BMPS UNTIL WORK HAS BEEN <br />COMPLETED, SITE HAS GONE UNDER FINAL STABILIZATION, AND THE NOTICE OF <br />TERMINATION HAS BEEN SUBMITTED TO THE MPCA OR THE SITE HAS TRANSFERRED <br />OWNERSHIP IN ACCORDANCE WITH PART 11.8.5 OF THE CONSTRUCTION GENERAL PERMIT. <br />O a1 e <br />vvv0 <br />�u b <br />co < C <br />O <br />33 5 <br />cZ�a <br />i 0 <br />O <br />F <br />Z Z <br />W O <br />m U <br />W 0 <br />1n Us <br />(n O <br />Q I w <br />Z _j <br />Q � <br />0 O <br />CL <br />O w <br />LL F <br />000 <br />O <br />� 7 <br />O <br />U z o <br />D 0 <br />O <br />U <br />43WSI <br />2Q OF 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.