My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Trailway 9-10_plan set_draft_2006-12-18
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2000-2009
>
2006
>
12-21-2006
>
Plans - 95%
>
Trailway 9-10_plan set_draft_2006-12-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2023 2:21:35 PM
Creation date
8/21/2024 3:03:31 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
R/W <br />•2.0' 10.0' (TYP) "2.0' <br />VAR. 1.0' VPo <br />RVAR.� <br />32% (TYP) <br />MIN. 4" TOPSOIL (TYP) <br />MIN. 4" TOPSOIL (TIP 2.5" TYPE SP 12.5 WEARING COURSE MIX (2,B) <br />SUITABLE GRADING I 6" AGGREGATE BASE CLASS 5 (100% CRUSHED) <br />MATERIAL GRANULAR BORROW <br />TYPICAL SECTION 1 <br />'CLEAR ZONE BITUMINOUS TRAIL <br />'CLEAR ZONE -2.0' 10.0' (TYP) @.0' R/W <br />VAR. VAR <br />VAR N�kyYl ±2% (TYP) (T:3 bq ) <br />MIN. 4" TOPSOIL (TYP) <br />MIN. 4" TOPSOIL (NP <br />SUITABLE GRADING <br />MATERIAL 2.5" TYPE SP 12.5 WEARING COURSE MIX (2,B) <br />GRANULAR BORROW 6" AGGREGATE BASE CLASS 5 (100% CRUSHED) <br />2' SUBGRADE EXCAVATION GEOTEXTILE FABRIC TYPE V <br />TYPICAL SECTION 2 <br />BITUMINOUS TRAIL <br />STA. 107+25 TO STA. 108+50 <br />(TO BE PLACED AS DIRECTED BY ENGINEER) <br />14'-0" <br />N0. 16 RAR <br />O 1'-6. O.C. MAX. <br />o CONC. SLAB <br />321< SLOPE <br />6' AGG. BASE <br />CUSS 5 (1008 CRUSHED) <br />SECTION A -A- CONC. DIST. SLAB <br />1'-0' <br />TOP OF 60" <br />WATER CONDOR <br />SOILS & CONSTRUCTION NOTES <br />1. GRADING GRADE IS DEFINED AS THE BOTTOM OF THE CLASS 5 AGGREGATE BASE. <br />2. SUITABLE GRADING MATERIAL ON THIS PROJECT SHALL CONSIST OF ALL SOILS ENCOUNTERED WITH THE EXCEPTION OF TOPSOIL, DEBRIS, PEAT, MUCK, OTHER <br />ORGANIC MATERIALS, OR OTHER UNSTABLE MATERIAL. <br />3. UNSUITABLE GRADING MATERIALS ARE TOPSOIL, DEBRIS, PEAT, MUCK, ORGANIC MATERIALS, OR OTHER UNSTABLE MATERIAL. <br />4. GRANULAR MATERIAL SHALL MEET THE REQUIREMENTS OF MN/DOT SPEC. 3149.281. <br />5. STRIP ALL TOPSOIL AND INPLACE SLOPE DRESSING WHERE PRESENT IN AREAS TO BE DISTURBED BY CONSTRUCTION AND REUSE SLOPE DRESSING. SLOPE <br />DRESSING ON THIS PROJECT IS DEFINED AS THE TOPSOIL OR OTHER SOILS WHICH HAVE BEEN PLACED DURING PREVIOUS CONSTRUCTION TO PROVIDE A <br />MEDIUM FOR ESTABLISHING TURF. THE AVERAGE DEPTH OF TOPSOIL LAYER IS ASSUMED TO BE 6 INCHES. <br />6. ALL TURF REMOVAL AND TOPSOIL STRIPPING LIMITS IN PREPARATION OF PLANTINGS AND RESTORATION SHALL BE CONSIDERED INCIDENTAL TO THE COMMON <br />EXCAVATION. <br />7. DISPOSITION OF EXCESS EXCAVATED MATERIAL SHALL BE IN ACCORDANCE WITH MN/DOT SPEC.2105.3D WITH NO DIRECT COMPENSATION MADE THEREFORE. <br />8. OBTAIN COMPACTION ON THE GRADING AND AGGREGATE BASE PORTIONS OF THE CONSTRUCTION IN ACCORDANCE WITH THE "SPECIFIED DENSITY METHOD" <br />REQUIREMENTS. <br />9. TEST ROLLING PALL BE REQUIRED ON THIS PROJECT IN ACCORDANCE WITH MNDOT SPEC. 2211 (INCIDENTAL). <br />10. STABILIZING AGGREGATE SHALL BE INCORPORATED INTO THE SUBGRADE TO ACHIEVE SATISFACTORY SURFACE STABILITY AT LOCATIONS DEEMED NECESSARY <br />BY THE ENGINEER, IN ACCORDANCE WITH THE PROVISIONS OF MNDOT SPEC. 2105.3G. GRANULAR MATERIAL WHICH IS FURNISHED BY THE CONTRACTOR SHALL <br />BE STABILIZED, IF NECESSARY, AT THE CONTRACTORS EXPENSE. <br />11. UNLESS OTHERWISE SPECIFICALLY ALLOWED OR REQUIRED BY THE CONTRACT, BITUMINOUS AND CONCRETE ITEMS DISTURBED BY CONSTRUCTION SHALL <br />BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE RECYCLED TO THE EXTENT ALLOWED IN BASE AND SURFACING ITEMS OR DISPOSED OF OUTSIDE <br />THE RIGHT-OF-WAY IN ACCORDANCE WITH SPEC. 2104.3C3. <br />12. UNLESS OTHERWISE REQUIRED, ADD 1(V) TO 20(H) TAPERS TO THE FULL DEPTH STATION LIMITS OF ALL SUB GRADE EXCAVATIONS. PROVIDE 1(V) TO 20(H) <br />TRANSITION TAPERS BETWEEN CHANGES IN SUB GRADE EXCAVATION DEPTH LONGITUDINALLY. <br />13. THE TOP OF BACKSLOPES AND THE TOE OF FILL SLOPES SHALL BE ROUNDED. <br />14. THE LOCATIONS OF THE EXISTING UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. THE CONTRACTOR SHALL VERIFY UTILITY LOCATIONS AND DEPTHS AS <br />REQUIRED BEFORE EXCAVATION. EXCAVATIONS TO LOCATE UTILITIES SHALL BE INCIDENTAL. THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE PATH <br />THE UTILITY COMPANIES AND CALL THE "GOPHER STATE ONE CALL" (1-800-252-1166) AT LEAST 48 HOURS PRIOR TO EXCAVATION/CONSTRUCTION. <br />15. ANY DEBRIS WHICH MAY BE ENCOUNTERED DURING GRADING SHALL BE DISPOSED OF BY THE CONTRACTOR OFF THE PROJECT RIGHT-OF-WAY IN A SUITABLE <br />DISPOSAL AREA AS APPROVED BY THE ENGINEER. <br />16. BITUMINOUS REMOVAL QUANTITY BASED ON SQUARE UNIT REMOVED REGARDLESS OF PAVEMENT DEPTH. CONTRACTOR SHALL INVESTIGATE AND MAKE OWN <br />DETERMINATION OF ACTUAL PAVEMENT DEPTH. <br />17. PIPE SEWERS CONNECTING MANHOLES AND CATCH BASINS SHALL BE IN ACCORDANCE WITH SPEC. 2503. BEDDING AND BACKFILL SHALL CONSIST OF UNIFORM <br />SELECTED GRADING MATERIAL MATCHING ADJACENT SOILS UNLESS OTHERWISE DIRECTED BY THE ENGINEER. <br />18. WHENEVER THE WORD 'INCIDENTAL" IS USED IN THIS PLAN, IT WILL MEAN THIS WORK WILL BE INCIDENTAL FOR WHICH NO DIRECT COMPENSATION WILL BE <br />MADE. <br />19. PLACE MINIMUM 6 IN. TOPSOIL OR SLOPE DRESSING ON ALL AREAS DISTURBED BY CONSTRUCTION AND SCHEDULED FOR PERMANENT TURF ESTABLISHMENT. <br />TOPSOIL BORROW TO BE UTILIZED AT THE DIRECTION OF THE ENGINEER IN THE FIELD. <br />20. ALL EROSION CONTROL MEASURES SHOWN IN THE PLANS SHALL BE IN PLACE PRIOR TO THE COMMENCEMENT OF GRADING OPERATIONS. <br />.� EWATER A WATER <br />1- DEEP SAW JOINT CONDUIT CONDUIT <br />OR <br />PIAN -CONCRETE DISTRIBUTION SLAB <br />4 OF 44 <br />SI <br />N <br />
The URL can be used to link to this page
Your browser does not support the video tag.