Laserfiche WebLink
Category <br />A <br />A <br />A <br />A <br />A <br />A <br />A <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />C <br />B <br />C <br />C <br />C <br />C <br />C <br />C <br />C <br />C <br />C <br />C <br />C <br />C <br />B <br />A <br />A <br />Year <br />2007 <br />2006 <br />2006 <br />2004 <br />2006 <br />2007 <br />2005 <br />2005 <br />2006 <br />2005 <br />2006 <br />2006 <br />2006 <br />2007 <br />2007 <br />2006 <br />2006 <br />2007 <br />2006 <br />2006 <br />2008 <br />2007 <br />2007 <br />2008 <br />2009 <br />2010 <br />2011 <br />2011 <br />2007 <br />2008 <br />2007 <br />2007 <br />2007 <br />2007 <br />MOUNDS VIEW PARK IMPROVEMENT PLAN <br />Park <br />Silver View <br />Silver View <br />Hillview <br />Oakwood <br />Silver View <br />Hillview <br />Groveland <br />Lambert <br />Random <br />City Hall <br />Hillview <br />Greenfield <br />Greenfield <br />Groveland <br />Groveland <br />Silver View <br />Silver View <br />Edgewood Drive <br />Greenfield <br />Oakwood <br />City Hall <br />Community Center <br />Woodcrest <br />Silver View <br />Sysco Outlot A <br />Lambert <br />Greenfield <br />Lambert <br />Groveland <br />Oakwood <br />Oakwood <br />Silverview <br />Silverview <br />Silverview <br />The needs list are categorized into three categories: <br />A.     Maintenance (do now) <br />B.     Budget (budgeted item in the next years budget) <br />C.     Long Term (add to Capital Improvement Program) <br />Item <br />Bridge <br />Ball Field <br />Rink <br />Picnic Tables <br />Parking Lot <br />Playground <br />Volleyball Court <br />Sidewalk <br />Border <br />Irrigation <br />Sidewalk & Parking lot <br />Parking Lot <br />Trail <br />Lights <br />Pleasure Rink <br />Lake <br />trail <br />Pavers <br />Lighting <br />Soccer field <br />Playground <br />Parking Lot <br />Trail <br />Parking Lot <br />Parking Lot and Trailway <br />Building <br />Parking Lot <br />Building <br />Details <br />Install bridge for disc golf course using Oakwood trail Bridge <br />Redo Silver View Ball Field #1 and warning track <br />Resurface rink at Hillview <br />replace picnic tables - 1 <br />Crack seal parking lot <br />Replace playground & fiberfill <br />Re-do & replace standards <br />replace broken sections of sidewalks <br />Replace border on playground <br />Add irrigation system to S, E, and W side <br />Install sidewalk 8 ft from Hillview Road to Hillview Park Shelter front door <br />Repair/sealcoat parking lot <br />Repair/sealcoat <br />Replace rink and court lights with more efficient fixtures <br />Level rink area and plant with hardy seed <br />Develop a proposal to treat the algae a) do nothing; b)barle straw treatment; c) bacterial treatment; <br />Repair/sealcoat <br />place colored concrete pavers between curb and pathway on Edgewood Drive <br />Replace security light with more efficient fixtures <br />Determine feasibility of small soccer field at the NW corner of Hillview & Quincy <br />Playground Replacement w/fiberfill <br />redesign so the front ends of vehicles do not overhang sidewalk; address drainage problem by day care; add storm sewer catch basin and pipe out to Bronson <br />Paved trail <br />Resurface <br />Construct a small parking lot and bituminous trailway on the Sysco Outlot A property - City is committed to spend up to $150,000. Remainder would be Medtronic's cost <br />replace building-design <br />Resurface <br />replace building-construction <br />Tree remediation <br />Add disc golf fields at north park to Greenfield <br />Move playground to southeast corner - New playground <br />Trail repair (bituminous) <br />Aerator install in pond <br />Bridge install <br />Cost <br />6000 <br />1000 <br />6533 <br />32000 <br />500 <br />1000 <br />2200 <br />12000 <br />2500 <br />1000 <br />8000 <br />800 <br />2000 <br />7200 <br />28000 <br />5000 <br />24000 <br />31000 <br />30000 <br />50000 <br />378000 <br />20000 <br />50000 <br />230000 <br />5000 <br />24000 <br />Budget -Maintenance/Park Dedication/Other <br />Park Rehab <br />Park Rehab <br />Park Rehab <br />Park Rehab <br />Park Rehab <br />Park Dedication <br />Park Rehab <br />Park Rehab <br />Park Rehab <br />Park Rehab <br />Park Rehab <br />Park Rehab <br />Park Rehab <br />Park Rehab <br />Park Rehab <br />Park Rehab <br />Park Rehab <br />Special Projects <br />Park Dedication <br />Park Dedication <br />Special Projects <br />Park Rehab <br />Park Dedication <br />Park Dedication <br />Special Projects <br />Park Dedication <br />CIP states $120,000 - $60K from Spec Proj & $60K from Park ded <br />Park Rehab <br />Last Updated: February 22, 2007 <br />Done? <br />Temp <br />Notes <br />Carried over to 2006 / 2007 <br />Fall of 2006 <br />Carried over to 2006 <br />Carried over till decision is made for park changes <br />Will be done with street crack sealing 2006 <br />To be done after building completion <br />with street seal coating <br />May be part of larger park lighting project <br />suggested during 2003 park tour <br />Working with street dept. <br />This was to be done with City Hall renovation <br />May be part of larger lighting project <br />This is being looked into and there may be options, decisions have not yet been made <br />Medtronic requested $150k Min. Most of area appears to be wetland - need remediation plan first. <br />PIP Item? Foresting to community plan <br />in process <br />2006B Item. Listed above <br />System from golf course <br />Listed above. Cost to move?