Laserfiche WebLink
additional note, one of the aerator is in poor condition and may not be usable — however these aerators <br />are relatively inexpensive. <br />b.) Other New Business? <br />7. Commissioner/Staff Reports: <br />a) County Road 10 Trailway Project: Segments 9&10 Project Update — Work on the trailway is well <br />underway. The contractor is currently working on establishing the gravel base for the trailway. <br />b) Oakwood Park Proposal <br />Phase I <br />Demolition of the park has been completed. Large Dozer were brought in on May 15`n to <br />perform the earthwork. The water service for the irrigation system was dug in on May 16`n <br />Shop drawings of the irrigation system have been received and the contractor has started the <br />installation of the system. After irrigation system has been installed, the contractor will provide <br />the City with "as -built" drawing of the system. The site is anticipated to be seeded within two <br />weeks. <br />Phase II <br />Phase II is the creation of a playground area adjacent to the proposed soccer fields. The <br />Commission has made a motion recommending "Recess Time II" in earth tone colors. The <br />proposal will include two bucket swings and two belt swings. The proposal excludes any "tot <br />lot" equipment. This is state bid item (state already received competitive bids) and may allow <br />City to forego the bidding process. It is anticipated that this would be ordered along with the <br />Hillview Park Playground Equipment. <br />Phase III <br />Disc Golf — The Commission has made a motion and recommended the design of an 18 -Hole <br />course by Mike Snelson from Fairway Flyerz. Mr. Snelson is currently working on the course <br />layout. He has taken GPS readings and some pictures of the area. He will be making <br />arrangements to have our City Forester meet with hien on site (this has not yet occurred as the <br />City's Forester has been on vacation). A preliminary plan should be available at the June 28`n <br />meeting for review and comments by the Commissioners. <br />c) Groveland Building Replacement Project — The site has been sodded. There remains a couple minor <br />punch list items for the contractor to address. The landscaping will be done by an Eagle Scout candidate <br />later this summer / early fall. <br />d) The YMCA Advisory Committee Meeting Update — The committee met on May 7, 2007. The agenda <br />included discussion regarding purchase of new tables along with security cameras. <br />e) Parks Promotional Video — A suggestion has been made to re -execute the parks video in the summer <br />when there is activity (softball, baseball, etc) going on. The City has authorized advertisement to hire a <br />full time cable coordinator. Once hired, this person can assist in the creation of this video. <br />