Laserfiche WebLink
Category <br />B <br />C <br />B <br />B <br />B <br />C <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />C <br />B <br />C <br />B <br />B <br />C <br />B <br />C <br />C <br />C <br />B <br />C <br />B <br />C <br />B <br />C <br />B <br />B <br />B <br />A <br />B <br />A <br />B <br />B <br />C <br />C <br />B <br />Year <br />2008 <br />2008 <br />2008 <br />2008 <br />2008 <br />2013 <br />2007 <br />2007 <br />2007 <br />2007 <br />2008 <br />2008 <br />2008 <br />2008 <br />2008 <br />2008 <br />2007 <br />2007 <br />2008 <br />2008 <br />2009 <br />2007 <br />2010 <br />2011 <br />2007 <br />2007 <br />2007 <br />2008 <br />2008 <br />2007 <br />2008 <br />2007 <br />2007 <br />2007 <br />2007 <br />2008 <br />2008 <br />2008 <br />2008 <br />2008 <br />2009 <br />2007 <br />GENERAL NOTES: <br />$35,000 has been budgeted for in 2007 for the Park Improvement Plan <br />MOUNDS VIEW PARK IMPROVEMENT PLAN <br />Park <br />City Hall <br />City Hall <br />Greenfield <br />Greenfield <br />Greenfield <br />Greenfield <br />Greenfield <br />Groveland <br />Groveland <br />Groveland <br />Groveland <br />Groveland <br />Groveland <br />Groveland <br />Groveland <br />Groveland <br />Hillview <br />Hillview <br />Hillview <br />Hillview <br />Hillview <br />Lambert <br />Lambert <br />Lambert <br />Oakwood <br />Oakwood <br />Oakwood <br />Oakwood <br />Oakwood <br />Oakwood <br />Oakwood, Woodcrest, Greenfield, Silver View <br />Random <br />Random <br />Random <br />Silver View <br />Silver View <br />Silver View <br />Silver View <br />Silver View <br />Silver View <br />Sysco Outlot A <br />Woodcrest <br />The needs list are categorized into three categories: <br />A.     Maintenance (do now) <br />B.     Budget (budgeted item in the next years budget) <br />C.     Long Term (add to Capital Improvement Program) <br />Item <br />Irrigation <br />Playground <br />Parking Lot <br />Trail <br />Lighting <br />Parking Lot <br />Pitcher's Mound <br />Trailway to Building <br />Picnic Tables (2) <br />Pleasure Rink <br />Ball Field <br />Remove Tree <br />Volleyball Court <br />Lights <br />Baseball Field Backstop <br />Tree remediation <br />Trailway to Building <br />Playground <br />Ball Field <br />Rink <br />Sidewalk & Parking lot <br />Sidewalk <br />Building <br />Building <br />Soccer field and Irrigation System <br />Fence <br />Playground <br />Picnic Tables/Benches/ Trash Receptacles <br />Disc Golf Course <br />Play set <br />Park Trailway Paving Project <br />Border <br />Picnic Tables (2) <br />Baseketball Court <br />Parking Lot <br />Pond Aerator <br />Ball Field <br />Lake <br />Trail <br />Parking Lot <br />Parking Lot and Trailway <br />Signage <br />Details <br />Add irrigation system to S, E, and W side <br />Playground Replacement w/fiberfill <br />Repair/seal coat parking lot <br />Repair/seal coat <br />Replace security light with more efficient fixtures <br />Rehabilitate Parking lot - Resurface <br />Pitcher's mound tarp & roller system <br />Construct trailway to building <br />Add two picnic tables next to the building <br />Level rink area and plant with hardy seed <br />Rehabilitate Ball field <br />Remove Large Cottonwood Tree <br />Re-do & replace standards and boarder <br />Replace rink and court lights with more efficient fixtures <br />Add to the height of the ballfield backstop <br />Remove and Replace Black Locus <br />Construct trailway to building <br />Replace playground & fiberfill <br />Rehabilitate Ball field <br />Reconstruct rink surface at Hillview <br />Install sidewalk 8 ft from Hillview Road to Hillview Park Shelter front door <br />replace broken sections of sidewalks <br />replace building-design <br />replace building-construction <br />Construct soccer fields and install an irrigation system at the SE corner of Hillview & Quincy <br />Construct a fence along Hillview and Quincy <br />Construct a new playground with boarder and fiberfill at the southeast corner of Hillview and Quincy <br />Add picnic tables (2), Benches (4), Trash Receptacles (4) <br />Add disc golf fields to north side of the park to Greenfield <br />Remove former playset swings, border, and sand <br />Pave trails at Oakwood, Woodcrest, Greenfield, Silver View <br />Replace border on playground <br />Add two picnic tables next to the building <br />Create a 25'X25' baseketballcourt <br />Crack seal parking lot <br />Aerator installed in Silver view pond - Running electrical to aerator represents the majority of the costs <br />Redo Silver View Ball Field #1 and warning track <br />Develop a proposal to treat the algae a) do nothing; b)barle straw treatment; c) bacterial treatment; <br />Repair/seal coat <br />Seal Coat <br />Construct a small parking lot and bituminous trailway on the Sysco Outlot A property - City is committed to spend up to $150,000. Remainder would be Medtronic's cost <br />Ad directional Signage to Playground Area <br />Cost <br />13000 <br />38000 <br />2500 <br />1000 <br />5000 <br />50000 <br />5200 <br />1000 <br />2200 <br />1500 <br />15500 <br />800 <br />2500 <br />8000 <br />10000 <br />5000 <br />1000 <br />38000 <br />15500 <br />6000 <br />30000 <br />1000 <br />30000 <br />260000 <br />50000 <br />10000 <br />20000 <br />7000 <br />18000 <br />500 <br />30000 <br />2500 <br />2200 <br />2200 <br />6500 <br />5000 <br />2000 <br />2000 <br />7200 <br />50000 <br />378000 <br />200 <br />Budget -Maintenance/Park Dedication/Other <br />Special Projects <br />Park Dedication <br />General Park Fund <br />General Park Fund <br />General Park Fund <br />General Park Fund <br />Park Dedication <br />General Park Fund <br />Park Dedication <br />General Park Fund <br />Park Dedication <br />Forestry Budget <br />Park Dedication <br />General Park Fund <br />Park Dedication <br />Forestry Budget <br />General Park Fund <br />Park Dedication <br />Park Dedication <br />General Park Fund <br />Municipal State Aid <br />Park Dedication <br />$15,000 Special Projects & $15,000 Park Dedication <br />$130,000 Special Projects & $130,000 Park Dedication <br />Park Dedication <br />Park Dedication <br />Park Dedication <br />General Park Fund <br />Park Dedication <br />General Park Fund <br />Park Dedication <br />Park Dedication <br />Park Dedication <br />Park Dedication <br />General Park Fund <br />General Park Fund <br />General Park Fund <br />General Park Fund <br />General Park Fund <br />Park Dedication <br />Park Dedication <br />General Park Fund <br />Last Updated: June 21, 2007 <br />Done? <br />Phase 1 <br />Phase 1 <br />Phase 2 <br />Phase 3 <br />Notes <br />In 2007 Budget <br />street seal coating <br />May be part of larger lighting project <br />$3,800 Mound / $1,400 tarp <br />Temporary - May do permanent sidewalk with a street project <br />$900 for each table / $200 for concrete <br />To be discussed: June 2007. Minor regrade or major re-do. Flip field? Irrigation? $3,000 grading/ $2,500 water tap/ $8,000 ballfield irrigation/ $2,000 shelter area irrigation <br />Approved 2005 PIP <br />May be part of larger park lighting project <br />Temporary - May do permanent sidewalk with a street project <br />In 2007 Budget <br />To be discussed: June 2007. Minor regrade or major re-do. Flip field? Irrigation? $3,000 grading/ $2,500 water tap/ $8,000 ballfield irrigation/ $2,000 shelter area irrigation <br />Approved 2005 PIP <br />Was in 2007/2008 Street Project - Sidewalk to Park Building will be pais via Park Dedication <br />Approved 2005 PIP <br />Oakwood Park Rehabilitation Project ($50,000 budgeted in 2006, $60,000 Budgeted in 2007) <br />Oakwood Park Rehabilitation Project ($50,000 budgeted in 2006, $60,000 Budgeted in 2007) $9,000 fence/ $1,000 Concrete ribbon under fence -do in house <br />Oakwood Park Rehabilitation Project ($50,000 budgeted in 2006, $60,000 Budgeted in 2007) <br />Oakwood Park Rehabilitation Project ($50,000 budgeted in 2006, $60,000 Budgeted in 2007) <br />Approved 2005 PIP. Include with Oakwood and Hillview Playset borders as one project <br />$900 for each table / $200 for concrete <br />City to level andn gravel site, contractor ro pave - $1,100, City to purchase and install standard <br />Will be done with street crack sealing: 2007 or early 2008 <br />Use areator system from golf course. Test using generator in 2007 <br />Review issue in 2007 <br />Working with street dept. <br />City to pay $150,000, Remainder from Medtronic. Most of area appears to be wetland - need remediation plan first.