6) Groveland: Building and sod looks good. Will wait to see traffic patterns before recommending trail <br />from street to building. Ball field maintenance work per recommendations discussed above. Need taller <br />backstop fence at Groveland. <br />Add line item for replacement of backstop (B item 2008 $ l OK), and field maintenance (A item 2007). <br />7) Adjust cost of Volleyball court—not $30K <br />8) Picnic tables coming to Groveland <br />9) Woodcrest: appears in good condition. Staff will include signage to playground <br />10) Random: Needs basketball court replaced, 25x25 bitiuninous scheduled this summer. <br />Also picnic table needed between playground and building. <br />11) Move border at Random playground to 2007 and tie in with Hillview and Oakwood. <br />6. New Business: <br />a.) Silver View Pond Aerator – The City Parks Department acquired two pond aerators with the sale of the <br />City's golf course. These pond aerators are used to minimize algae growth in ponds during the summer <br />months. These aerators could be used to help with the algae issue at Silver View Pond. The main cost <br />associated with installing these aerators at Silver View Pond is extending electrical power to the <br />aerators. This cost is estimated to be $5,000. Staff is suggesting that aerators be installed and that a <br />portable generator be used to power the aerators on a temporary basis. This would give the city a better <br />indication as to the effectiveness of the aerators before expending the funds to run electrical lines. As an <br />additional note, one of the aerator is in poor condition and may not be usable – however these aerators <br />are relatively inexpensive. Direct staff to proceed as suggested and give Commission feedback. <br />b.) Park Signs. Considering replacing existing park signs. Have $4,000 budgeted for 5 signs. Direct staff <br />to bring examples/drawing and brochure to June meeting. Commission encouraged to check out <br />website: www.fastsigns.com <br />7. Commissioner/Staff Reports: <br />a) County Road 10 Trailway Project: Segments 9&10 Project Update –Work on the trailway is well <br />underway. The contractor is currently working on establishing the gravel base for the trailway. <br />b) Oakwood Park Proposal <br />Phase I <br />Demolition of the park has been completed. Large Dozers were brought in on May 15th to <br />perform the earthwork. The water service for the irrigation system was dug in on May 10H <br />Shop drawings of the irrigation system have been received and the contractor has started the <br />installation of the system. After irrigation system has been installed, the contractor will provide <br />the City with "as -built" drawing of the system. The site is anticipated to be seeded within two <br />weeks. <br />Phase II <br />Phase II is the creation of a playground area adjacent to the proposed soccer fields. The <br />Commission has made a motion recommending "Recess Time II" in earth tone colors. The <br />proposal will include two bucket swings and two belt swings. The proposal excludes any "tot <br />lot" equipment. This is state bid item (state already received competitive bids) and may allow <br />City to forego the bidding process. It is anticipated that this would be ordered along with the <br />Hillview Park Playground Equipment. <br />