My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Parks and Recreation Commission Meeting Packet - August 23, 2007
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2000-2009
>
2007
>
08-23-2007
>
Parks and Recreation Commission Meeting Packet - August 23, 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2023 3:25:07 PM
Creation date
8/21/2024 3:07:27 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Parks and Recreation and Forestry Commission Meeting Agenda <br />August 23, 2007 <br />6:30 P.M. <br />1. Roll Call <br />2. Approval of minutes from the July 26, 2007 meeting. <br />3. Public Input - Citizens are encouraged to speak to the Park and Recreation and Forestry Commissioners <br />on issues of concern. <br />4. YMCA Update <br />5. Unfinished Business: <br />a.) Disc Golf Course — At the July 26, 2007 meeting the Commission directed Staff to identify costs <br />associated with the bridges and parking lot. There are three bridges that are proposed. The City <br />currently has two of the bridges. The plan for the 3`d bridge would be to have it built by Stillwater <br />Correctional Institute inmates. Costs estimates associated with this 3`d bridge are still being developed. <br />The parking lot is roughly estimated to cost $30,000. This estimate was based on the cost estimate <br />developed for the Sysco Outlot A Property which included a six stall parking lot and a somewhat <br />lengthy two-way driveway lane to the parking lot ($31,300 from January 2006 feasibility report). The <br />cost estimate was also based on the cost estimate for the proposed Hillview Park parking lot ($28,700 <br />for fourteen stalls accessed directly off of Hillview Road and concrete sidewalk). <br />Disc Golf Course Schedule and Overall Project Plan — <br />The Commission may want to consider and discuss an overall plan. Possible items to discuss: <br />• Start with 9 -hole at this time. Identify any issues. Construct an interim parking lot see what the <br />need is first before committing to construction. If successful, consider additional 9 -hole at a <br />later date <br />• Layout Schedule: Neighborhood Meeting late September, City Council Work Session in <br />October. <br />• Oder Project in October <br />• Perform some clearing this fall <br />• Most construction occurring next spring <br />• Rest Room Plan: have at least one rest room placed on site <br />• Trash Can Placement Plan — every third hole (3) — start with temporary mounting system to <br />ensure they are placed at optimum locations <br />• Include Information Board? Course layout, information where get maps, reminder that success <br />of the course depends on being good stewards on this facility... <br />• Other issues.... <br />
The URL can be used to link to this page
Your browser does not support the video tag.