My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Parks and Recreation Commission Meeting Packet - September 27, 2007
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2000-2009
>
2007
>
09-27-2007
>
Parks and Recreation Commission Meeting Packet - September 27, 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 7:25:48 AM
Creation date
8/21/2024 3:15:34 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Mounds View <br />To: Parks and Recreation Commissioners <br />From: Greg Lee <br />CC: Steve Dazenski <br />Shannon Roepke <br />Date: 12/19/2002 <br />Re: Skate Park at the Community Center <br />At the November 21, 2002 Parks and Recreation Meeting, the Commissioners changed their <br />recommended Skate Park site location from Groveland Park to the Community Center. The <br />Commissioners also made a motion to have staff identify costs associated with constructing a Skate <br />Park at the Community Center. <br />The following is a cost summary of items that would be associated with construction of constructing a <br />Skate Park at the Community Center. <br />RECONSTRUCT THE SURFACE THE BASKETBALL COURT - $20,000 <br />The existing court slopes 6" in 34 feet — this would not be conducive to skate boarding or any other <br />wheeled sport <br />* If Public Works removes the existing bituminous $18,000 <br />FENCING $4,500 <br />Place a 10 foot cyclone fence around the Skate Park — three sides (105'X34'X34") <br />IRRIGATION ALTERATIONS <br />The existing irrigation would need to be altered: relocate, raise sprinkler heads, <br />change valveing. <br />LIGHTING <br />Add two additional lights to the roof of the Community Center. One light may need <br />to be mounted on a pole located further away from the building so as to illuminate <br />the entire Skate Park. <br />ENTRANCE DOOR <br />To provide an entrance to the Skate Park area from the Community Center, <br />an additional exterior security door would need to be constructed, This would <br />need to be done in such a fashion so as to preserve or provide a new fire exit door. <br />$1,500 <br />$2,000 <br />$8,000 <br />SECURITY CAMERA $1,000 <br />Add two exterior cameras and run wire <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.