My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Random Park Eagle Scout Project Workbook
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2000-2009
>
2007
>
09-27-2007
>
Random Park Eagle Scout Project Workbook
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2024 7:22:47 AM
Creation date
8/21/2024 3:15:36 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT DE A] <br />J <br />Plan your work by describing the present condition, the method, materials to be used, project helpers, and a time <br />schedule for carrying out the project. Describe any safety hazards you might face, and explain how you will <br />ensure the safety of those carrying out the project. <br />The present condition of the site is a very un-kept and needs work. The area looks <br />torn up and unorganized. The method I am using is to organize work groups to <br />complete the project in two phases and will take two days to complete. The work will <br />take place over two weekends, one in the fall and one in the spring. <br />What needs to be done. <br />Dig out the beds <br />Make the bordering material even with the soil surrounding the beds. <br />- Level the topsoil and fill in uneven spots. <br />- Cut and lay anti weed material. <br />Plant the plants in the correct areas of the park. <br />- Lay mulch on top of anti weed fabric. <br />Day One — Phase One (preparation f«r planing) <br />Day one will include digging the four beds and leveling out the soil four inches below <br />grade. We will also make the metal border level with the surface surrounding the <br />gardens. We will lay the anti weed material, and spread mulch. Finally in the first <br />phase I will put markers in the soil below the anti weed material which will be used <br />later to locate the places to plant the plants in the spring. <br />Note: <br />The mulch and chips will be placed in the parking lot of the park by the city. Next to <br />the pile of mulch I will put the dug out plant material and dirt that was removed from <br />the garden. The mulch and plant waste will be put on tarps. <br />I will call Gopher State One before digging in the fall and before digging in the spring <br />to avoid hitting gas or electric lines. The borders of the gardens in the park are metal <br />and need to be adjusted when the work is done. They are in good working shape <br />otherwise. <br />All of the materials that 1 need for the project are provided by the city. The total cost <br />is about 1500 dollars. I will go with Mr. Dazenski to the store to purchase the <br />materials and plants needed for the project. Mr. Dazenski will pay for the materials <br />there and I will pick the materials out. <br />Resources: <br />In the first phase we will need at least 20 helpers (10 per shift) and an estimate of <br />about 8 work hours. it will be the same for the second phase. The total work force <br />needed for the project will be 40 helpers. This number includes both days and <br />phases of work. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.