My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Parks and Recreation Commission Meeting Packet - February 28, 2008
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2000-2009
>
2008
>
02-28-2008
>
Parks and Recreation Commission Meeting Packet - February 28, 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2023 9:02:16 AM
Creation date
8/21/2024 3:19:18 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COSTS <br />The costs for some of the tasks can be estimated fairly accurately, while other costs would be dependent on <br />the proposed bridge location. The following breakdown gives approximate costs for the various tasks. It <br />must be emphasized that these costs are based on averages from previous projects, and could vary <br />significantly for a specific bridge re -use project considered. <br />Design (Pre -construction) Costs <br />Site Survey <br />$ 2,000 <br />Wetland Delineation <br />$ 1,000 <br />Geotechnical Exploration <br />$ 5,000 <br />Hydraulic Analysis <br />$ 1,500 <br />Haz. Materials Investigation (if required) <br />$ 1,500 <br />Structure Design <br />$ 8,000 <br />Design Subtotal <br />$19,000 <br />Construction Costs <br />Mobilization <br />$ 7,500 <br />Furnish Bridge Superstructure <br />$ 0 <br />Deliver Bridge <br />$ 2,500 <br />Abutment Construction <br />$25,000 <br />Drive Piling (if required) <br />$20,000 <br />Install Bridge <br />$ 7,000 <br />Redeck <br />$ 3,000 <br />Construction Observation <br />$ 4,000 <br />Construction Administration <br />$ 2,000 <br />Construction Subtotal <br />$71,000 <br />Project Total $90,000 <br />The costs shown are for one bridge. The cost to re -use both bridges would be approximately double the <br />total shown, unless both bridges were used on the same project, in which case some overlap of tasks could <br />result in a slight cost reduction. Costs could also be reduced if City staff were able to complete some of the <br />work tasks, such as delivering the bridges to their new locations. Costs do not include any aesthetic <br />features, such as textured or colored concrete. <br />SUMMARY <br />The two bridges currently being stored by the City of Mounds View appear to be in good condition and <br />structurally adequate for re -use at new locations. While the City would not incur any costs for the bridges <br />themselves, re -use of the bridges would result in a significant expenditure by the City due to the many tasks <br />required in the design and construction processes. <br />Mounds View, MinnesotaProject No; 435.07000-0 <br />Pedestrian Bridge Re -use f Bonestroo Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.