My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ped Bridge Re-use Report
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2000-2009
>
2008
>
02-28-2008
>
Ped Bridge Re-use Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2023 9:02:18 AM
Creation date
8/21/2024 3:19:18 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View, Minnesota Project No: 435-07000-0 <br />Pedestrian Bridge Re-use Page 3 <br />COSTS <br />The costs for some of the tasks can be estimated fairly accurately, while other costs would be dependent on <br />the proposed bridge location. The following breakdown gives approximate costs for the various tasks. It <br />must be emphasized that these costs are based on averages from previous projects, and could vary <br />significantly for a specific bridge re-use project considered. <br />Design (Pre-construction) Costs <br />Site Survey $ 2,000 <br />Wetland Delineation $ 1,000 <br />Geotechnical Exploration $ 5,000 <br />Hydraulic Analysis $ 1,500 <br />Haz. Materials Investigation (if required) $ 1,500 <br />Structure Design $ 8,000 <br />Design Subtotal $19,000 <br />Construction Costs <br />Mobilization $ 7,500 <br />Furnish Bridge Superstructure $ 0 <br />Deliver Bridge $ 2,500 <br />Abutment Construction $25,000 <br />Drive Piling (if required) $20,000 <br />Install Bridge $ 7,000 <br />Redeck $ 3,000 <br />Construction Observation $ 4,000 <br />Construction Administration $ 2,000 <br />Construction Subtotal $71,000 <br />Project Total $90,000 <br />The costs shown are for one bridge. The cost to re-use both bridges would be approximately double the <br />total shown, unless both bridges were used on the same project, in which case some overlap of tasks could <br />result in a slight cost reduction. Costs could also be reduced if City staff were able to complete some of the <br />work tasks, such as delivering the bridges to their new locations. Costs do not include any aesthetic <br />features, such as textured or colored concrete. <br />SUMMARY <br />The two bridges currently being stored by the City of Mounds View appear to be in good condition and <br />structurally adequate for re-use at new locations. While the City would not incur any costs for the bridges <br />themselves, re-use of the bridges would result in a significant expenditure by the City due to the many tasks <br />required in the design and construction processes.
The URL can be used to link to this page
Your browser does not support the video tag.