<br />Kroeger made a format for survey and will start sorting data. <br /> <br />There was not a meeting…….Nothing to report <br /> <br />What is the completion date? Approx. 2 weeks…Status? The surface and bumpers have been removed and grading has been started. <br /> <br />Fishing pier will be delayed till next spring because of Minn. Cons back log. The DNR will be supervising the project. <br /> <br />4 a) Dazenski gave a wonderful report on what has been done off the Needs <br />Analysis List. <br /> b) Dazenski with the aid of an aerial photo pointed out that we could make a <br /> usable but small soccer field on the Oakwood Park area. It would require <br /> elevation corrections for run off and level playing surface but it was <br /> explained that materials could be secure at low or no cost to the city. <br /> <br />No other items discussed. <br /> <br /> <br />5 a) Porta potty has been moved to the backstop area. <br /> <br />Volleyball courts: Dazenski explained that the timbers are used to <br />contain the sand and not for boundaries. There is rope that designates <br />the boundaries. <br /> <br />Sedimentation pond: Dazenski explained that the pond had been dug <br />out and that the engineers would have to approve final grade. The weir <br />and culvert will be installed sometime in the next two weeks as we need to get the seed and mulch in as soon as possible. <br /> <br /> <br />Purple Loostrife update: We did not see any blooming on the east end of the pond and that is a very good sign that the beetles did their job! <br />The DNR would like to harvest beetles from our sites next spring.