My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2024/08/26
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2024
>
Agenda Packets - 2024/08/26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:43 PM
Creation date
8/22/2024 1:14:10 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
8/26/2024
Supplemental fields
City Council Document Type
Packets
Date
8/26/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION 9963, EXHIBIT A <br /> RESIDENTIAL ELECTRICAL PERMIT FEES (SINGLE FAMILY HOMES,APARTMENTS, and Effective 1/1/2023 <br /> CONDOMINIUMS) <br /> HOMEOWNERS AND CONTRACTORS:Complete an electrical permit form available from the Building Inspections <br /> Division.Add $1.00 for State surcharge to total cost of each permit. The fee is the total of the listed fees or the total number <br /> of inspection trips x$50.00, whichever is greater. <br /> Residential panel replacement is $110.00, sub <br /> panel $50.00. New service or power supply is: Circuits and Feeders <br /> 0 to 300 Amp $55.00 0-100 Amp $9.00 <br /> 400 Amp $71.00 101-200Amp $15.00 <br /> Add $16.00 for each additional 100 amps Add $6.00 for each additional 100 amps <br /> Minimum Fee: Maximum Fee: <br /> Minimum permit fee is$50.00 plus$1.00 State Maximum fee for single family dwelling or <br /> surcharge. This is for one inspection only. townhouse not over 200 amps(No max if <br /> Minimum fee for rough-in and final inspection is service is over 200Amps)is$200.00 plus <br /> $100.00 plus$1.00 State surcharge. $1.00 State surcharge. Maximum of 2 rough-in's and 1 final <br /> inspection. (Failed inspections are an additional $50.00 each) <br /> Apartment Buildings <br /> Fee per unit of an apartment or condominium complex is$90.00. <br /> This does not cover service, unit feeders or house panels. <br /> Swimming Pools and Hot Tubs Additions, $100.00 plus circuits at$9.00/each.This includes 2 inspections. <br /> Remodels or <br /> Basement Finishes $100.00 this include up to 10 circuits and 2 inspections <br /> The Greater of$55.00 for panel plus$9.00 per circuit or$100 for <br /> Residential Accessory Structures 2 inspections. <br /> Street and Parking Lot Lights $5.00 per each standard <br /> Transformers and Generators $5 up to 10kva, $45 11 to 74kva, $60 75kva to 299kva, over <br /> 299kva is$165 <br /> Retrofit Lighting $0.85 cents per fixture <br /> Sign Transformer or Driver $9.00 per transformer <br /> Low voltage fire alarm, low voltage $0.85 cents per device <br /> heating and air conditioning control wiring <br /> Residing jobs First unit: $50 <br /> $35 for each additional units <br /> Re-Inspection Fee in addition <br /> $50.00 <br /> to all other fees <br /> Solar fees: <br /> Okw to 5kw=$90 5.1 kw to 10kw=$150 <br /> 10.1 kw to 20kw=$225 20.1 kw to 30kw=$300 <br /> 30.1 kw to 40kw=$375 40.1 kw and larger is$375 plus$25 for each additional 10kw <br /> Electronic inspection fee for these items only;furnace,air conditioning, bath fan,fireplace or receptacle for water <br /> heater vent is$40. <br /> Refunds must be requested in writing. No refunds unless more than the minimum fee. Refunds are minus the cities 20% handling fee. <br /> THE PERMIT FEE IS DOUBLED IF THE WORK STARTS BEFORE THE PERMIT IS ISSUED. <br /> Minimum fee permits expire in 6 months. <br /> Permits over the minimum fee and up to $250 expire in 1 year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.