My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2024/09/23
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2024
>
Agenda Packets - 2024/09/23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:08 PM
Creation date
9/19/2024 2:09:22 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
9/23/2024
Supplemental fields
City Council Document Type
Packets
Date
9/23/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The proposal was broken down in both the accessible (front) and non-accessible (back) by <br /> Diameter Breast Height (DBH). <br /> Three (3) companies submitted proposals: <br /> Contractor Total*Cost(Qty x cost) Bid alternate- <br /> (includes all front and backyard Stump Removal(includes black dirt and seed) <br /> trees) regardless of location) <br /> *Annual Amount based on the <br /> size and total count of MV trees <br /> removed in 2023 <br /> Upper Cut Tree Service $358,612.00 DEM Diametar SWmp Removal Cost' <br /> each <br /> Front Back <br /> 1 -6,0Lic 62- <br /> 6.1 -7.9 _ 5 <br /> 8,0-9.9 L15 �I 3 <br /> 10,a- 11.9 -75 <br /> 12.0- 13.9 , <br /> 14.0- 15_9 ► :P_rs <br /> 1 B.0- 17.9 41 7 <br /> 18.0-19.9 z+da o <br /> 20.0-21.9 <br /> 22.0-23.9 boa T 2,1 <br /> 24.0-25.9 3 r 31F 1 <br /> 26_0-27.9 5 44 L'7 <br /> 28.0-29.9 WO r S a <br /> 30.0-31.9 t4A 6 5 <br /> -32.0-3a,9 '-f-71 �r <br /> 34.0-36.9 5 4 <br /> 36.0-37.9 sgo 690 <br /> a8.0-39.9 10 1 10 -71 6 <br /> 40.0-41.9 6S I '7Sl <br /> 42.0-43.9 610 19 0 <br /> 44.0-45.9 -7-IL'1 2 <br /> 46.0+ bra 950 <br /> DBH Diameter Stump Rem val Cost' <br /> The Davey Tree Expert Co $639,350.00 Each <br /> Front Sack <br /> &0-9.9 J]tom S <br /> 10.0- 11.9 ts0 S <br /> 12.0-13.9 j SID <br /> 141- 15.9 22 z417 <br /> 16.11-17.9 LO3 ITS' <br /> 16.0-19.9 log 323 <br /> 20.0-21.9 3&0 �5-3 <br /> 22.0-23.9 3 '3 <br /> 24.0-25.9 <br /> 20.0-27.9 <br /> 28.0-29.9 Lj SO <br /> 30.0-31.9 S-i <br /> 32.0-33_2 .540 <br /> M.4-35.9 <br /> 36.0- 7.9 t <br /> 38.0-39.9 (PBO <br /> 40.0-41.9 I,.n o <br /> 42.0-43_9 <br /> 44.0-45.9 o l <br /> 46.0+ q 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.