Laserfiche WebLink
4. Non-Profits making and receiving the waiver must clean the facility and remove all trash or will forfeit their$200 <br /> deposit. <br /> 5. Residents/Neighborhood Groups requesting use of a Park Facility for Night to Unite are required to pay the$25 <br /> securit de•osit for the ke and si.n a use a.reement that details cleanu. and usa.e re.uirements. <br /> VII. PUBLIC WORKS RELATED FEES <br /> Call-Out Rate Schedule Based on Current Wages <br /> Normal Business Hours for Call-Out Rates 7:00 am to 3:30 pm, Monday thru Friday <br /> After Hours Call-Out Rate, Specified Time $100/hr. (Minimum 2 hours) <br /> Conducted Outside Normal Business Hours <br /> Holiday Call-Out Rate, Specified Time Conducted $150/hr. (Minimum 2 hours ) <br /> on Holidays <br /> Right-Of-Way Management Fees (Title V, Chapter 54) Additional Fees May be Required for Legal and <br /> Engineering Costs Incurred by the City) All issued right-of-way permits will include a $125 <br /> administrative fee. <br /> Excavation, Hole Fees, Boulevard Areas $100 per hole <br /> Excavation, Hole Fees, Pavement Areas $200 per hole <br /> Excavation, Underground Utility Work, Open $50 per 100 lineal feet or fraction thereof(requires hole <br /> Trenching — Boulevard Areas Open fee) <br /> Excavation, Underground Utility Work, Open $70 per 100 lineal feet or fraction thereof(requires hole <br /> Trenching — Pavement Areas fee) <br /> Excavation, Trenchless Installation $35 per 100 lineal feet or fraction thereof <br /> Excavation, Overhead Installation $25 per 100 lineal feet or fraction thereof <br /> Obstruction, New Pavement $100 per obstruction <br /> Obstruction, Replace Existing Obstruction (in- $50 per obstruction <br /> kind) <br /> Temporary Obstruction, Dumpster, Portable $25 per obstruction <br /> Restroom, etc. <br /> Temporary Obstruction, Equipment Used for No Charge <br /> Excavation <br /> Miscellaneous ROW Management Fees and Costs (Discount for Work Done Pertaining to City Project; <br /> Additional Fees May be Required for Legal and Engineering Costs Incurred by the City) <br /> Street Opening Permit (Requires Deposit) $200 <br /> Street Opening Deposit To be determined by the Director of Public Works <br /> Registration Fee (ROW Users and Registrants) $30 <br /> Permit Extension $30 <br /> Delay Penalty 10% of ROW Permit <br /> Degradation Fee Calculated at time of permit <br /> Restoration Cost _Calculated at time of permit <br /> Overhead Utility Line Repair No Charge <br /> Penalty for Work Done without a Permit Double Fee 50% <br /> Municipal Water System Fees (Title V, Chapter 52) <br /> Water Availability Charge (WAC), Residential $500 per unit <br /> WAC Charge, Commercial/Industrial $1,000 per acre of developable land ($1,000 minimum <br /> charge) <br /> Residential Water Usage Base Charge $23.00 per quarter <br /> Residential Water—0 to 12,000 gallons $2.85 per 1,000 gallons per quarter <br /> Residential Water— 12,000 to 24,000 gallons $3.14 per 1,000 gallons per quarter <br /> Residential Water—Over 24,000 gallons $3.61 per 1,000 gallons per quarter <br /> Commercial Water Usage Base Charge $23.00 per quarter <br /> Commercial Water— 0 to 125,000 gallons $2.85 per 1,000 gallons per quarter <br /> Commercial Water— 125,000 to 700,000 gallons $3.14 per 1,000 gallons per quarter <br /> Commercial Water— 700,001 to 1,100,000 gallons $3.49 per 1,000 gallons per quarter <br /> 2024 Mounds View Fee Schedule Page 13 of 14 <br />