My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-26-2024 PRF Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2020-2029
>
2024
>
09-26-2024 PRF Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2024 12:55:28 PM
Creation date
9/26/2024 12:52:08 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SWM Utility Rate Charge ,R-4 High Density $110.08 per acre per quarter <br /> Residential, R-5 Mobile Homes and R-O <br /> Residential Office <br /> SWM Utility Rate Charge ,B-1 Neighborhood $144.19 per acre per quarter <br /> Business, B-2 Limited Business, B-3 Highway <br /> Business and B-4 Regional Business <br /> SWM Utility Rate Charge, I-1 Industrial $116.83 per acre per quarter <br /> SWM Utility Rate Charge, PUD Planned Unit $127.67 per acre per quarter <br /> Development <br /> SWM Utility Rate Charge, CRP Conservancy, $17.00 per acre per quarter <br /> Recreation and Preservation <br /> SWM Utility Rate Charge, School or Church, $51.81 per acre per quarter <br /> Public or Private <br /> Illicit Discharge Fee To be determined by the Public Works Director on a case- <br /> by-case scenario. <br /> Storm Water Management(The permit fee schedule adopted 12/08/2021 by the Rice Creek Watershed District <br /> Board. The fee for a permit is the cumulative total of all individual aspects of a project. Government entities are <br /> exempt from the permit fees). <br /> Rule C (Storm water Management): <br /> Residential, Commercial, Industrial, Institutional $3,000 non-refundable fee due at time of application. <br /> development that proposes less than 5 acres of new Once application review costs (District Engineer and <br /> and/or reconstructed impervious surface Legal Counsel) exceed $9,000*, any additional cost <br /> must be reimbursed by the applicant before the permit <br /> can be issued. <br /> Residential, Commercial, Industrial, Institutional $5,400 non-refundable fee due at time of application. <br /> development that proposes 5 or more acres of new Once application review costs (District Engineer and <br /> and/or reconstructed impervious surface Legal Counsel) exceed $9,000*, any additional cost <br /> must be reimbursed by the applicant before the permit <br /> can be issued. <br /> Notes: An application subject to a Rule C fee is exempt from the Non-Rule C fee of$300. <br /> The following is exempt from the Rule C fee and subject to only the Non-Rule C fee of$300: Single-family <br /> residential subdivision that creates seven or fewer lots and establishes no new public roadway or a private <br /> roadway/driveway serving three or more lots <br /> Non-Rule C Fee: A $300 non-refundable fee is due at the time of application for a project subject to one or <br /> more of the following Rules: <br /> Rule D (Erosion and Sediment Control Plans) <br /> Rule E (Floodplain Alteration) <br /> Rule F (Wetland Alteration) <br /> Rule G (Regional Conveyance Systems) <br /> Rule I (Public Drainage Systems) <br /> Rule J (Appropriation of Public Waters) <br /> Rule L(Variances): Variable. See District Permit Variance Guidance Policy <br /> * Review cost is calculated according to the consultant hourly rate, which the District will publish annually. The <br /> review cost incurred between the non-refundable fee amount and $9,000 will be absorbed by the District and <br /> will not be the responsibility of the applicant. District staff will notify the applicant of the incurred cost to date <br /> once the total review cost exceeds $7,500, and at subsequent$3,000 intervals. A delay in notice, however, will <br /> not affect the applicant's reimbursement responsibiliiy <br /> Storm Water Connection/Repair/Disconnect $100 plus surcharge <br /> Storm Water Inspection or re-inspection after Call-out rate per visit (Minimum 2 hours) <br /> hours <br /> Street Lighting Utility Fees (Title XV,-Chapter 152.018) <br /> Residential (single family homes, duplexes, r$5.00 per unit per quarter <br /> fourplexes, condominium and townhomes) <br /> 2024 Mounds View Fee Schedule Page 15 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.