My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-07-2024 WS
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2024
>
10-07-2024 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:25 PM
Creation date
10/17/2024 1:22:38 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/7/2024
Supplemental fields
City Council Document Type
Packets
Date
10/7/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2024 Mounds View Fee Schedule Page 2 of 14 <br /> <br />INDEX <br />I. Building/Community Development Fees Page 2 <br />II. Other Inspection / Planning Fees Page 3 <br />III. Miscellaneous (copies, maps, agenda, etc.) Page 5 <br />IV. Police/Administrative Offenses Page 5 <br />V. Licenses Page 6 <br />VI. Parks, Recreation, and MVCC Facility Rental Fees Page 8 <br />VII. Public Works/Municipal Utility Fees Page 11 <br />Appendix A – 2022 2023 MN State Statutes: 326B.153 Building Permit Fees <br />Appendix B – 2022 2023 MN State Statutes: 326B.148 Surcharge <br /> <br />I. BUILDING/COMMUNITY DEVELOPMENT RELATED FEES <br />Building Permit (State Surcharge Required, See Appendix <br />B) <br />Fees shall be based on valuation according to <br />Appendix A, unless specifically noted otherwise or <br />as determined by the City’s Building Official <br />Building Permit Plan Review 65% of Building Permit Fee (Building Official may <br />waive plan review fee for certain projects that <br />require diminutive plan review such as partial <br />basement finishes, kitchen remodeling, and minor <br />repairs/alterations. <br />Building Permit Reinspection $63.25 per State Statute 326B.153 <br />Building Permit Investigation Fee (starting work without an <br />approved/issued permit) <br />Equivalent to permit fee <br />Renewable Energy System (Solar PV Building Permit: <br />Small Rooftop Streamlined, Geothermal, Wind Energy <br />Conversion) – Residential <br />$150 <br />Renewable Energy System (Solar, Geothermal, Wind <br />Energy Conversion) – Commercial <br />See Appendix A <br />Billboards/Billboard Alterations (includes Footings) $250 per billboard plus surcharge <br />Roofing or Siding – Single Family Residential <br /> Partial (less than 25%) of principal structure; or <br /> Detached Accessory Structures only <br />$100 <br />$65 <br />Roofing or Siding – Townhomes and rental properties up <br />to five units <br />$60 per unit <br />Roofing or Siding – Commercial See Appendix A <br />Window or Door Replacement <br />(within existing openings) <br />$65 for one window or door <br />$100 for two or more windows and/or doors <br />Telecommunications Antenna – New System $750 plus engineering/inspection fees if located <br />on City-owned property plus surcharge (see <br />Public Works for further information) <br />Telecommunications Antenna – Repairs/ <br />Alterations/Swapping or Adding Antennas to Existing <br />System (City or Private Property) <br />$250 per permit plus surcharge <br />COMMERCIAL ELECTRICAL PERMIT <br />$50.00 per trip or the fee below, whichever is great (Solar fees are the same as residential solar fees) <br />Valuation $1 to $1,000 $50.00 Per trip <br />Valuation $1,001 to $2,000 $50.00 for the first $1,000 plus $3.25 for each <br />additional $100 or fraction thereof, to and <br />including $2,000
The URL can be used to link to this page
Your browser does not support the video tag.