Laserfiche WebLink
materials and staff time spent in the review, research or preparation of materials associated with each <br /> application. The applicant shall be responsible for all reasonable incurred costs in excess of the initial fee <br /> and/or deposit amount. Any portion of the deposit not spent or encumbered shall be refunded to the applicant <br /> within 30 days after consideration of the application is completed. Payment of nark dediGatlen foes is required <br /> with subdivision appliGa+iens. rayment or any park dedication fees shall be made by the applicant after <br /> final plat approval. Application fees are not refundable. <br /> Building Inspections Conducted Outside Normal Business $63.25/hour (two-hour minimum charge) <br /> Hours <br /> Change of Address $150 <br /> Change of Occupancy $75 <br /> Comprehensive Plan Amendment $500 <br /> Conditional Use Permit, R-1 or R-2 $400 <br /> Conditional Use Permit, All Other Districts $400 <br /> Conditional Use Permit Amendment Same as CUP Fee <br /> Contractor License (Title XV, Chapter 150.053)) $60 <br /> Contractor State License Verification Fee $5 per permit <br /> Development/Site Plan Review $400 <br /> Escrow— Manufactured Homes $500 per permit <br /> Escrow— Occupancy (Seed, sod, landscaping; as-building $1,000 for each item <br /> grading survey; driveway installation; curb cut <br /> modifications; site clean-up; storm water management; <br /> drainage features; site erosion; right-of-way restoration; or <br /> any other items as determined by the Building Official) <br /> Escrow, Planning (actual charges) $2,500 - $10,000 <br /> Housing Inspection Initial and One Follow-Up (includes No Charge (Title XI, Chapter 119) <br /> now shows <br /> Housing Inspection/No Show, each additional $100 <br /> Interim Use Permit (IUP) $400 <br /> IUP Amendment $400 <br /> Park Dedication Fees (O Residential: $3,500 per unit <br /> Non-Residential: Up to 10% of estimated market <br /> value (of land) <br /> Plan Review (Payment Required Before Plans are 65 percent of permit fee for all commercial permits <br /> Reviewed) and for residential permits for new dwellings, <br /> dwelling additions, garages, garage additions, <br /> decks, sheds over 200 square feet, and major <br /> remodeling. <br /> Plan Review for Changes, Revisions, or Additions to Plans $47/hour one half-hour minimum charge) <br /> Plan Review, Engineering (Applicable to any project that $100 per permit <br /> changes the grade. To be determined by Staff during <br /> application review). <br /> Plan Review for Outside Consultants for Plan Checking Actual costs including administrative and <br /> and Inspections or Both overhead costs <br /> Plan Review Similar (all units are same or similar) Each unit after the first shall be 25% or original <br /> fee <br /> Planned Unit Development (PUD) (Title XV, Chapter $1,000 <br /> 160.300) <br /> PUD Amendment $400 <br /> Refund, Permits (within 100 days of application if work is All but $40 <br /> not commenced) <br /> Refund, Plan Review 100% (If review has not been done) <br /> Refund, State Surcharge 100% <br /> Rezoning $500 <br /> Vacation, Street or Easement $250 <br /> 2025 Mounds View Fee Schedule Page 6 of 16 <br />