Laserfiche WebLink
the curb on the North side of Bronson Drive. The sidewalk is included in the Mater Trail and <br /> Sidewalk Plan. <br /> The location of the new parking lot will be in the green space North of the splash pad and <br /> would eliminate the street parking on Edgewood Drive and create a safer environment for <br /> the patrons and an area for the buses to park. <br /> Remaining Discussion: <br /> Stantec has provided a construction estimate of $1,302.000.00 for the 2025 Street Project <br /> this does not include any water main work, gate valves and sanitary sewer main line repairs, <br /> or cured in place pipe work (CIPP). <br /> Stantec has also provided a cost proposal of $110,500.00* to complete the preliminary and <br /> final designs, plans and specifications, prepare the project for bidding and record plans for <br /> the 2025 Street Project. <br /> *Costs and pavement design are also based on the American Engineering Testing Inc. (AET) <br /> geotechnical and pavement evaluation report. <br /> Strategic Plan Strategy/Goal: Maintain and Plan for Infrastructure Improvements. <br /> Financial Impact: No Financial Impact to 2024 Budget. The Street Improvement CIP-fund, <br /> 485-4470-7050 includes $125,000.00 for engineering costs for this proposed project. <br /> Recommendation: Staff recommends the City Council adopt the attached Resolution <br /> approving Stantec to complete the final design plans, specifications and bidding documents <br /> for the 2025 Street Improvement Project. <br /> Respectfully submitted, <br /> Don Peterson <br /> Director of Public Works/Parks and Recreation <br /> The Mounds View Vision <br /> A Thriving Desirable Community <br />