Laserfiche WebLink
s <br />A. Tributary Draina ae Area <br />The tributary drainage area to the Oak Lake Park ponding area <br />includes the Kraus Anderson development, a major portion of the <br />Scottland Green Apartments complex, and lands to the west of <br />Silver Lake Road and north of County Road I that are presently <br />tributary to the wetlands. Not included are the ONiell property <br />to the east, the Mounds View City Hall area, and the shopping <br />center at County Road I and Highway 8. <br />The attached figure shows the limits of the drainage area that <br />is considered as tributary to the ponding area. The total area <br />involved is 203 acres. <br />In terms of land use, the breakdown of the tributary drainage <br />area is as follows: <br />Multiple Residential (Apt.) 18.0 A <br />Single Family Residential 19.8 <br />Park (includes pond) 53.7 <br />Multiple Residential + Comm. 45.5 <br />Single Family and Commercial 66.0 <br />Total 203.0 A. <br />At final development, the amount of impervious surface can be <br />calculated as follows: <br />Acres % Impervious Acres Imn. Acres Perv. <br />Multiple Apt. <br />18.0 <br />60 <br />10.8 <br />7.2 <br />Single Family <br />19.8 <br />35 <br />• 6.9 <br />12.9 <br />Park <br />36.7 <br />10 <br />3.7 <br />33.0 <br />Lake <br />17.0 <br />(100) <br />17.0 <br />0.0 <br />Mult. Res. and Comm. <br />45.5 <br />60 <br />27.3 <br />18.2 <br />SFR and Comm. <br />66.0 <br />50 <br />33.0 <br />33.0 <br />Totals <br />98.7 <br />104.3 <br />Total Percentage <br />49% <br />51% <br />B. Derivation of the Unit Hydroaraph <br />Method used in calculating the unit hydrograph is from the "Denver <br />Method" <br />L = 5400/5280 = 1.03 Lca = 0.57 Ct = 0.45 Cp = 0.40 <br />tp = 0.45(1.03x0.57) = 0.38 hrs. = 23 min. <br />qp = 0.4(640)/0.38 = 674 cfs. Qp = 674(203)/640 = 214 cfs <br />Time to peak = 23 + 15 = 38 min. <br />Vol for 1" runoff = 203/12 = 16.91 AF. <br />Hydrograph width @ 75 percent = 23 min, @ 50 percent = 40 min. <br />