My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2021/07/06
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2021
>
Agenda Packets - 2021/07/06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2025 2:51:22 PM
Creation date
2/25/2025 2:10:30 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
7/6/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NA-02622-01 <br />-54) <br />(Rev 74) <br />w <br />STATE OF- MINNESOTA <br />DEPARTMENT of NATURAL RESOURCES <br />APPLICATION FOR PERMIT TO WORK IN PUBLIC WATERS <br />M & E Development, Inc. , the owner of land in Government lot(s) , <br />print or type applicant's none <br />quarter section(s) NE14 , section(s) 7 , township no.(s) 30 range(s) 23 , <br />Moundsview, Minnesota Oak Lake Paris Addition <br />Ire no., box no. or reel(lot, block & su ivision <br />Ramsey Unnamed Marsh and Ditch <br />county(ies) which is riparian to <br />(name of Lake or strem) <br />applies pursuant to Minnesota Statutes Chapter 105 and other applicable statutes for a permit to work in the <br />public water(s) named above, in accordance with all data, maps, plans, and other information submitted <br />herewith and made a part hereof. <br />PROPOSAL <br />IT IS PROPOSED TO: <br />(check) <br />C.L)_I excavate, Q fill, Q construct, = remove, <br />Q install, Q abandon, or = other specify) <br />THE FOLLOWING: Q dam, Q shore -protection, Q shoreline, Q harbor, Q channel, Q bridge, <br />(check) Q culvert, Q wharf, = obstruction, or M other(specify) Stormwater Pond <br />JUSTIFICATION <br />Explain why this project is needed: <br />Development of stormwater pond is required by the City of Moundsview as <br />a part of their overall stormwater plan. Pond will reduce downstream <br />discharge rates during major runoff events. <br />ENVIRONMENTAL 114PACf <br />1. Anticipated changes in water and related land resources: <br />Pond size will increase as snown on attached plans.. An outlet structure <br />will limit rates of discharge from the site and drainage area. <br />2. Unavoidable but anticipated detrimental effects: <br />There will be modification of present wetlands vegetation. Also, there <br />will be an increase in pond size and some decrease in upland habitat area. <br />3, Alternatives to the action Oroposed: <br />No action. Will result in continuation of severe flooding iit downstream <br />areas or will greatly restrict development in the tributary drainage <br />area due to the need to limit peak discharges. <br />PROJECT SITE DATA <br />1. Describe the type and amount of aquatic vegetation present: <br />See the attached report by Dr. .lames A. Jones. <br />2. describe the nature of the material beneath the water: <br />Peat and organic soils. Sands in upland areas. <br />3. Describe the nature of the upland area: <br />Relatively level to rolling grassland with groves of mature trees (oaks). <br />Apartment development to the south. <br />4. Describe type and amount of nearby shorelind development: <br />Apartment development along south marsh boundary. <br />S. ENCLOSE SKETCH DESCRIBING WATER LEVEL FLUCTUATIONS. <br />(see instructions) ATTACH EXTRA SHEETS IF NECESSARY <br />(continued on reverse side) <br />See enclosed letter by G. M. Sunde, P.E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.