My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2021/07/06
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2021
>
Agenda Packets - 2021/07/06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2025 2:51:22 PM
Creation date
2/25/2025 2:10:30 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
7/6/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
❑ Plans and specifications for all proposed stormwater management facilities, including <br />design details for outlet control structures <br />❑ Easements by type <br />❑ EOF Locations and Elevations <br />❑ Basin NWL and HWLs <br />❑ Building Elevations <br />❑ Grading Limits <br />❑ Utility plan <br />❑ Certified Retaining Wall Design <br />2. Water Quality Treatment <br />❑ Sequencing: <br />❑ Required Water Quality Volume: <br />❑ Provided Water Quality Volume: <br />❑ Required Vs. Provided Water Quality Volume: ❑ Surplus ❑ Deficit <br />❑ Credit Provided for Pond Bench Toward Infiltration Requirement: ❑ Yes ❑ No <br />3. Rate Control <br />❑ Modeling calculations provided using NOAA Atlas 14 rainfall data <br />❑ Peak Discharge Rates < Existing for 2-year, 10-year, 100-year, and snowmelt events <br />❑ Model direct connected impervious separate <br />4. Infiltration/Retention BMPs <br />❑ Soil borings to confirm infiltration rate <br />❑ Pretreatment <br />❑ Drawdown within 48-hours <br />❑ 3' separation from seasonal high water table <br />S. Water Quality BMPs <br />❑ Meets NURP standards including: <br />❑ Dead pool requirements <br />❑ Water quality volume requirements <br />❑ Skimmer <br />❑ Maintenance access <br />6. Freeboard <br />❑ Groundwater Separation <br />❑ Building Opening: <br />❑ At least 3' above 100-yr HWL; or <br />❑ At least 2' above 100-yr HWL with following documentation: <br />
The URL can be used to link to this page
Your browser does not support the video tag.