My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2021/07/12
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2021
>
Agenda Packets - 2021/07/12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2025 2:51:34 PM
Creation date
2/25/2025 2:14:46 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
7/12/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
O'NEIL PROPERTY <br />PLANNED UNIT DEVELOPMENT <br />10. A perpetual easement obtained from MnDOT for use of Highway <br />10 right-of-way for this purpose may be substituted for an easement on <br />the O'Neil property. <br />22. Fire Protection <br />The design of the access point(s) and placement of on -site fire <br />hydrants shall be approved by the Blaine -Spring Lake Park -Mounds <br />View Fire Department. <br />The requirements of the Fire Department shall be met prior to issuance <br />of any use and occupancy permits on the property. <br />23. Undergrounding of Utilities; Utility Design <br />All existing utilities within the site boundaries and any additional utility <br />lines installed in conjunction with this development shall be installed <br />underground. Existing utilities may be placed underground concurrent <br />with the installation of new utilities. A monetary guarantee for the <br />placement of utilities underground shall be provided if required by a <br />development agreement. <br />Development in this PUD shall connect to public water, sewer and <br />storm sewer systems. The requirement for utility shut-off values and <br />service manholes shall be determined at the time of development <br />stage plan and plat approval, based on the criteria in Section 1120.02 <br />of the Mounds View Municipal Code. <br />24. Site Improvement Agreement <br />A site improvement agreement shall be signed by the property owner <br />prior to approval of the final plan. The agreement shall specify the on - <br />site and off -site improvements to be constructed and shall be <br />guaranteed through an escrow account, letter of credit or surety bond <br />as determined by the City Clerk -Administrator. <br />O'NEIL PLANNED UNIT DEVELOPMENT <br />2430 HIGHWAY 10 <br />PAGE 8 OF 9 <br />25. Signatures <br />KNOW ALL MEN BY THESE PRESENTS: That Louise O'Neil, <br />, owner of the following described <br />property situated in the City of Mounds View, County of Ramsey, State <br />of Minnesota: <br />The Southwest 1/4 of the northwest 114 of Section 8, Township 30, Range 23, lying <br />southwesterly of Stale Trunk Highway No. 10-62, according to the United States <br />Government Survey thereof and situate in Ramsey County, Minnesota and all that part of <br />the northwest 1/4 of the northwest 114 of Section 8, Township 30. Range 23, lying <br />southwesterly of State Trunk Highway No. 10, according to the United States Government <br />Survey thereof and situate in Ramsey County, Minnesota_ <br />Have filed an application for a development stage plan prepared by <br />Sunde Engineering,Artech Design Group, and Boarman Kroos Pfister <br />Vogel & Associates dated 316198 and revised on 4124198, and do <br />hereby agree to the terms of the PUD stipulations contained in this <br />Exhibit 1 to Resolution No. 5226 <br />In witness whereof said Louise O'Neil, has <br />MOUNDS VIEW PLANNING CASE N0, 517-99/471-97 <br />EXHIBIT I OF RESOLUTION N0, 544-98 <br />APPROVED BY THE MOUNDS VIEW PLANNING COMMISSION ON 4/15/98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.