My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2021/07/26
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2021
>
Agenda Packets - 2021/07/26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2025 2:51:44 PM
Creation date
2/25/2025 2:16:30 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
7/26/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item 05D <br />Page 7 of 11 <br />Staff is not aware of any coordinated sign plan from the 1990's in <br />which to compare the current proposal to. Thus, it is up to the City <br />Council's discretion. <br />The Ground Sign will be 16' in height, consistent with the <br />Municipal Code. The Code requires Ground Signs to have a <br />masonry base, which the proposed pylon sign does not. Within the <br />development, there are three Ground Signs; theater, strip mall, <br />and Apple Tree Dental. All three signs differ in design, and two do <br />not have a masonry base. <br />There will be two menu boards; a 16 sq ft "preview board", 7' in <br />height, and a 32 sq ft "menu board", 6' in height. Neither will <br />include a dynamic (digital) display. <br />At the July 71" Planning Commission meeting, the Commission <br />was supportive of the proposed signage. <br />Construction Timetable Construction will begin as soon as possible. The Developer would <br />like to begin in August. <br />Planned Unit Development The 1997 PUD Narrative includes specific restrictions for <br />permitted uses; architecture, landscaping, and other details, and is <br />generally more restrictive than the City Code was in 1997. The <br />PUD Narrative is an overall plan for any and all development of <br />the O'Neil property, which lays between Mounds View Blvd, Co <br />Rd H2 and Long Lake Rd, and includes the movie theater, <br />Subway strip mall, Bridges school, and Apple Tree Dental. It is <br />the intent of the PUD Narrative for it to be amended (updated), <br />whenever a change is proposed. It is somewhat of a duplication <br />of the Development Review. <br />The intent of this Resolution is to clarify that a drive-thru business <br />such as Caribou Cabin, is an Allowed Use, and that the proposed <br />architecture, landscaping, and signage is acceptable, with <br />conditions stated in this Resolution. <br />The Mounds View Vision <br />A Thriving Desirable Community
The URL can be used to link to this page
Your browser does not support the video tag.