My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes - 2011/08/08
MoundsView
>
Commissions
>
City Council
>
Minutes
>
2010-2019
>
2011
>
Minutes - 2011/08/08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2025 10:01:40 AM
Creation date
2/26/2025 3:21:52 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Minutes
MEETINGDATE
8/8/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View City Council August 8,2011 <br /> • Regular Meeting Page 7 <br /> for the Design Phase of the Street and Utility Improvement Project—Area E. <br /> Public Works Director DeBar stated the City has a Street and Utility Improvement Program in <br /> place. The City has completed three years of the nine year program thus far. The next area,Area <br /> E was set to begin, with work completed in 2012. The first step in this process was to complete <br /> the topographic surveying of the 4.0 miles of roadway within Area E. <br /> Public Works Director DeBar noted Bonestroo has been contacted to gain a fee estimate for the <br /> entire design phase. The complexity of this project was being reviewed as the Area was more <br /> dense than the previous Areas. He expected Staff would have additional design fee information <br /> available at the August 22nd meeting. Staff recommended the Council authorize Bonestroo to <br /> perform topographic surveying for the design phase of Area E. <br /> MOTION/SECOND: Flaherty/Gunn. To Waive the Reading and Adopt Resolution 7818, <br /> Authorizing Bonestroo to Perform Topographic Surveying for the Design Phase of the Street and <br /> Utility Improvement Project—Area E. <br /> Ayes—4 Nays—0 Motion carried. <br /> 8. CONSENT AGENDA <br /> A. Set a Public Hearing for Monday, August 22, 2011, at 7:05 p.m. for the <br /> • Introduction and First Reading of Ordinance 861, Amending Titles 1000, <br /> 1100 and 1200 about Variances. <br /> B. Set a Public Hearing for Monday, September 12, 2011, at 7:05 p.m. to <br /> Consider an On-Sale Intoxicating Liquor License and Restaurant License for <br /> El Loro Mexican Restaurant located at 2535 County Highway 10. <br /> C. Set a Public Hearing for Monday, August 22, 2011, at 7:10 p.m. for Second <br /> Reading and Adoption of Ordinance 862, an Ordinance Implementing a <br /> Franchise Fee on Xcel Energy Electric and Natural Gas Operations within <br /> the City of Mounds View. <br /> D. Set a Public Hearing for Monday, August 22, 2011, at 7:15 p.m. for Second <br /> Reading and Adoption of Ordinance 863, an Ordinance Implementing a <br /> Franchise Fee on Center Point Energy Natural Gas Operations within the <br /> City of Mounds View. <br /> MOTION/SECOND: Gunn/Hull. To Approve the Consent Agenda as presented. <br /> Ayes—4 Nays—0 Motion carried. <br /> 9 JUG _":i_iD CORR C ':�AIMC <br /> Firs :cc Directs Beer answered r c::-:stions related tc <br /> MOTION/SECOND: Gunn/Stigney. To Approve the Just and Correct Claims as presented. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.