My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes - 2012/08/13
MoundsView
>
Commissions
>
City Council
>
Minutes
>
2010-2019
>
2012
>
Minutes - 2012/08/13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2025 9:46:55 AM
Creation date
2/26/2025 3:54:32 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Minutes
MEETINGDATE
8/13/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
with the equipment replacement at Lambert Park. <br /> <br />Public Works Director DeBar explained he solicited bids on the playground equipment layout prepared by Minnesota/Wisconsin Playground of Golden Valley, Minnesota. The recommended layout <br /> would cost $72,744.67, which includes furnishing and installing three playground units, a concrete border, and engineered wood fiber media. The proposed layout was discussed in detail <br /> with the Council. <br /> <br />Public Works Director DeBar indicated that Minnesota/Wisconsin Playground was on the national cooperative venture (similar to state cooperative venture) and has furnished and installed <br /> previous playground equipment in Mounds View in a satisfactory manner. Staff and the Parks Commission recommended the Council approve the playground equipment replacement at Lambert <br /> Park. <br /> <br />Council Member Mueller questioned the color scheme of the playground equipment. Public Works Director DeBar stated Staff was recommending a green and brown color scheme. These colors <br /> seemed to resist fading in the long-run and would blend in well with the nearby park shelter. <br /> <br />Council Member Stigney requested the location of the concrete border. Public Works Director DeBar reviewed the location with the Council. <br /> <br />Mayor Flaherty was pleased with the proposed design of the playground equipment. <br /> <br />MOTION/SECOND: Gunn/Stigney. To Waive the Reading and Adopt Resolution 7980, Approving Playground Equipment Replacement at Lambert Park. <br /> <br />Council Member Mueller asked if the quoted price included installation of the playground equipment. Public Works Director DeBar stated the installation was included in the quoted price <br /> and the concrete sidewalk around the equipment. <br /> <br />Public Works Director DeBar asked which colors the Council wanted to proceed with on the playground equipment. The Council recommended the brown and green color scheme. <br /> <br /> Ayes – 5 Nays – 0 Motion carried. <br /> <br />8. CONSENT AGENDA <br />Resolution 7974, Accepting and Approving the Allocation of the Twin Cities Gateway 2012 Community Festivals and Events Grant. <br />Set a Public Hearing for Monday, August 27, 2012 at 7:15 p.m. to Consider a Conditional Use Permit for a Tire and Auto Repair Business at 2832 County Road 10. <br />Resolution 7978, Renewal of Training Contract with Century College. <br />Resolution 7982, Calling for a Public Hearing by the City Council on the Proposed Modification to the Project Plan for the Mounds View Economic
The URL can be used to link to this page
Your browser does not support the video tag.