My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes - 2000/05/22
MoundsView
>
Commissions
>
City Council
>
Minutes
>
2000-2009
>
2000
>
Minutes - 2000/05/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2025 10:14:21 AM
Creation date
2/27/2025 10:41:39 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Minutes
MEETINGDATE
5/22/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View City Council May 22, 2000 <br />Regular Meeting Page 7 <br />• maintenance, breakdown, and buyback of the backhoe. He explained that at the end of five <br />years, Zeigler Corporation, which handles the Caterpillar dealership in the area, would guarantee <br />the City $45,000 for the repurchase of the machine. He noted that this price was the low end, <br />and Ziegler would obviously have to come up with the competitive market price for the machine, <br />with the hours of usage it has accumulated. <br />Interim Administrator Ulrich advised that the City also had a guaranteed breakdown of $2,000. <br />He explained that for any major component of the machine that requires replacement because it <br />has broken down as a result of a manufacturer defect, or any combination of any parts of the <br />machine, the City would only be liable for $2,000 worth of the cost of that repair in that five-year <br />period, and the remainder would be paid by Zeigler. <br />Interim Administrator Ulrich stated the guaranteed maintenance includes the costs for changing <br />oil, greasing the machine, and preventative maintenance. He indicated the requirements for <br />greasing the machine are based upon a specific number of hours of usage, and through the <br />competitive purchasing agreement and the written specifications, the Caterpillar backhoe was <br />less expensive than other machines. He stated these factors were considered in the interest of <br />protecting the City from the costs of major breakdowns and major maintenance. He added that if <br />the City desired to sell the machine back to Zeigler, they were aware of exactly how much the <br />machine would be worth. He advised that other competitors did not quote as competitively as <br />Zeigler, and that is why the City chose to purchase the Caterpillar backhoe. <br />Mr. Jahnke inquired if the maintenance program was similar to an extended warranty agreement, <br />which must be purchased. <br />Interim Administrator Ulrich indicated the maintenance of the backhoe is set up by Caterpillar, <br />which specifies that the machine must undergo certain maintenance procedures within a specific <br />number of hours of usage. He stated the costs for the anticipated labor and materials over the <br />course of five years would be the guaranteed maintenance. He advised that the guaranteed <br />breakdown represents the primary benefit to the City, in that this provides that the City would <br />only be liable for $2,000 of the expense of any breakdowns related to the hydraulic system, <br />electrical system or any of the major components of the machine over the course of five years. <br />Mayor Coughlin inquired if the City has utilized this guarantee. <br />Interim Administrator Ulrich stated yes. He indicated the backhoe that is currently in the shop <br />belongs to Zeigler Corporation. He stated there has been an ongoing problem with the hydraulic <br />system on that machine, and Zeigler has corrected it a number of times for a relatively small <br />amount of hours of usage during any given period. He explained that the hydraulic problem has <br />been somewhat difficult to isolate, and Ziegler has spent a significant amount of their money <br />attempting to repair the backhoe. He advised that Ziegler is still in the process of repairing the <br />machine, and staff has indicated that they desire the machine to be repaired to the City's <br />specifications and properly functioning, or replaced. He stated an enormous amount of money <br />• has been saved on this repair, which otherwise, after one year or a specific number of hours, <br />would have to be paid by the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.