My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes - 2002/06/24
MoundsView
>
Commissions
>
City Council
>
Minutes
>
2000-2009
>
2002
>
Minutes - 2002/06/24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2025 12:52:29 PM
Creation date
3/4/2025 12:52:28 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Minutes
MEETINGDATE
6/24/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View City Council June 24, 2002 <br />Regular Meeting Page 7 <br /> <br />• <br />• <br />Director Ericson indicated that the mill and overlay of County Road 10 would begin in early July. <br />Public Works Director Lee indicated the project would be started on July 8, 2002. <br />Director Ericson indicated there would be a new driving surface, more visible crosswalks and <br />new striping. He also noted that Public Works Director Lee has been working with Ramsey <br />County on the efficiency of the crossings. <br />Director Ericson briefly reviewed the flooding issue with the trailway by Walgreen's and <br />indicated that the problem is the trail is located in the floodplain. He then indicated the City has <br />the option of leaving it alone and letting the water drain away or elevating the trail by two feet to <br />get it above flood stage and putting a culvert under it. <br />Director Ericson briefly reviewed the issues with the Mermaid trailway and indicated the <br />property owner in Boston had been contacted for permission to move the trail onto their property. <br />He then commented that, for now, the trail dead ends at a large pine tree. <br />Council Member Marty asked whether the City could go around the tree or if it was coming out. <br />Director Ericson indicated the tree is in an area that would hinder development efforts on that <br />parcel and would need to come out. <br />Director Ericson indicated Council would need to consider in August or September whether to <br />survey all of the corridor right of way to be sure of all the obstructions, impediments and grading <br />that would need to be done for the trailway to be connected. <br />Council Member Thomas asked whether T21 dollars were applicable. <br />Director Ericson indicated he thought they would be. <br />Council Member Marty commented that the City is supposed to have a trailway along the north <br />side of H2 and said he saw in the Public Works report the possibility of coming up Silver Lake <br />Road and then asked whether that had been looked into. <br />Director Ericson said he has not and yes. <br />Council Member Quick asked what would flood first Walgreen's parking lot, the street or the <br />Community Center pond. <br />Director Ericson indicated it is not likely that flooding would reach the Walgreen's parking lot. <br />He then said if it goes to the Community Center parking lot it is graded to flow to the storm <br />sewer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.