Laserfiche WebLink
Mounds View City Council March 9, 2009 <br />Regular Meeting Page 4 <br />1 position.. <br />2 <br />3 Ayes - 5 <br />4 <br />Nays - 0 Motion carried. <br />5 The Council and staff welcomed Mr. DeBar with a round of applause. <br />7 C. Resolution 7419, Approving a Longevity Increase for Office Kasey <br />8 Keckeisen. <br />1o Assistant Clerk-Administrator Crane presented the finding of Deputy Chief Tom Kinney that <br />11 Officer Kasey Keckeisen has satisfactorily performed in the capacity of his position. Therefore, <br />12 Deputy Chief Kinney recommends a longevity wage adjustment, which is consistent with the <br />13 Police Officer Labor Agreement. She advised that Officer Keckeisen will go from longevity of <br />14 3% at $33.42 per hour to longevity of 5% at $34.07 per hour, effective March 17, 2009. <br />15 <br />16 MOTION/SECOND: Mueller/Stigney. To Adopt Resolution 7419, Approving Longevity <br />17 Adjustment. <br />18 <br />19 Councilmember Mueller read the resolution in full and thanked Officer Keckeisen for providing <br />20 a Crime Prevention Tip of the Week. <br />21 <br />22 Ayes - 5 Nays - 0 Motion carried. <br />23 <br />24 D. Resolution 7420, Authorizing the Preparation of a Preliminary Feasibility <br />25 Report and Consultant Selection for Area C of the Street and Utility <br />26 Improvement Program. <br />27 <br />28 Joe Rhein, Consulting Engineering, presented the staff report and recommendation to accelerate <br />29 the schedule by combining Area B (scheduled for 2010 of 1.4 miles) and Area C (scheduled for <br />30 2011 of 2.7 miles) to create a larger sized project, hopefully resulting in favorable bids in this <br />31 time when the economy is depressed. Mr. Rhein stated to consider this option the City needs <br />32 adequate cash flow, to determine if it makes sense to combine the Areas, and the project <br />33 schedules need to be compatible. He reviewed staff s findings that accelerating the program by <br />34 one year will result in a negative cash flow so a one year break would be needed at some point, it <br />35 does make sense to combine Area B and Area C, and the project schedules are compatible. He <br />36 reviewed the potential savings equaling $75,000 to $100,000 due to economy of scale, one less <br />37 year of maintenance costs in Area C, and need for only one combined engineering document <br />38 resulting in lower engineering, legal review, and advertisement. Mr. Rhein reviewed the <br />39 anticipated project schedule and recommendation that Bonestroo Engineering be used since it <br />4o had completed the survey and Area B feasibility report. He noted the draft resolution would only <br />41 commit to doing the Area C report, not moving forward with construction or a combined report. <br />42 <br />43 Jim Battin, 2332 Laport Drive, Street and Utility Commissioner, noted the Area A bid was <br />• 44 $700,000 under the estimated cost due to the depressed economy so the combined bid for Areas <br />45 B and C could be $500,000 lower than the estimate if bid one year earlier. <br />