My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1983/04/11
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1983
>
Agenda Packets - 1983/04/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 3:37:01 PM
Creation date
3/12/2025 3:34:55 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
4/11/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />MEMO TO: Mayor and City Coun <br />FROM: Clerk-Administrato <br />DATE: April 14, 1983 <br />SUBJECT: WELL NO. 6 REPAIRS <br />The following actions have been taken with respect to the repair of <br />Well No. 6: <br />1. All of the equipment in Well No. 6 was pulled from the Well <br />by Layne Minnesota on Friday, April 8th, and Monday, April llth, <br />at a cost of $1,700.00 which was previously authorized by the <br />City Council. <br />2. An inspection of the equipment by Layne Minnesota has revealed <br />that besides general maintenance work being needed, along with <br />the replacement of a small number of parts, an entirely new <br />five stage pump bowl, at a cost of $3,474.00, is recommended <br />as the repair of pump bowl would cost $5,955.00 thereby making <br />the purchase of a new unit more desirable. The total cost of <br />repairs to Well No. 6, as outlined by Layne Minnesota, which <br />include the baling of the Well to remove deposits found in the <br />bottom of the Well, will total $8,872.50. <br />3. It is advisable that while the Well pump and shaft has been <br />pulled and after baling has been completed on the Well, that <br />the Well be televised by Midwest Underground at a cost of <br />$1,250.00 to confirm the condition of the Well hole. <br />In discussions with City Attorney Meyers, lie has advised myself <br />and Mr. Johnson that .it is his opinion that the three items listed <br />above are three entirely separate items which do not require that <br />the City goes to sealed bids in order to have the work performed. <br />He does, however, recommend that proposals be obtained from at <br />least two other companies on the repair work identified in Item No. 2 <br />in order that we comply with State statutes for contracts between <br />$5,000.00 and $10,000.00. Staff will be contacting Keys Well <br />Drilling and Bergerson-Caswell, who submitted sealed bids for the <br />repair of Well No. 5, to determine if these companies would be <br />interested in submitting proposals for the repair of Well No. 6. <br />The televising of Well No. 6 would be performed by Midwest Underground <br />and can be authorized by a purchase order issued with the approval <br />of the City Council. <br />
The URL can be used to link to this page
Your browser does not support the video tag.