Laserfiche WebLink
n <br />October 13, 1982 <br />Page 3 <br />Deletion of $5,000 from the Contractual Repairs account <br />for water main breaks is proposed as it is felt this is <br />a duplication since a contingency of $15,000 for breaks <br />is budgeted. <br />Account <br />4513 Contractual Repairs, <br />Utilities <br />Second Third Change <br />Draft Draft <br />18,000 13,000 - 5,000 <br />Proposed reductions of the Water Administration budget by <br />$2,433 and of the Water Operations budget by $21,456 result in <br />total proposed reductions in the Water Fund budget of $23,889. The <br />total proposed 1983 Water Fund expenditure budget is $254,318. <br />Estimated revenues at current rates of $0.55/1,000 gallons of water <br />sold is $292,870. This results in an estimated net income of $38,552 <br />for 1983. <br />SEWER FUND <br />The proposed Sewer Administration budget has been reduced by <br />$23,980. Of this amount $2,433 is the result mf budgeting for the <br />Director of Public Works/Community Development position as a consultant <br />on a 1/2 time basis rather than 3/4 time as an employee. Changes to <br />individual accounts are: <br />Account <br />Second <br />Third <br />Change <br />Draft <br />Draft <br />4010 <br />Salaries <br />15,207 <br />8,092 <br />- 7,115 <br />4030 <br />Pensions <br />1,856 <br />987 <br />- 869 <br />4040 <br />Group Insurance <br />945 <br />660 <br />- 285 <br />4050 <br />Workman's Comp. <br />30 <br />16 <br />- 14 <br />4303 <br />Professional Services <br />4,836 <br />10,686 <br />+ 5,850 <br />I recently spoke with Richard Berg, MWCC Comptroller, about <br />the City's 1983 sewerage treatment charges. Mr. Berg gave me a <br />figure of $354,754 and stated that at budget hearings they have had <br />there has been no talk of their budget increasing. Their final <br />budget hearing is scheduled for October 19, 1982. Mr. Berg anticipates <br />their budget will be finalized at that meeting. This new figure is a <br />decrease of $21,547 from our previous estimate. <br />Account Second Third Change <br />Draft Draft <br />4323 MWCC Charges 376,301 354,754-21,547 <br />