My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1982/11/08
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1982
>
Agenda Packets - 1982/11/08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 9:37:07 AM
Creation date
3/13/2025 9:37:07 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/8/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
j6o�v <br />MEMO TO: Mayor and City Council <br />FROM: Director of Public Works/Community Development <br />DATE: November 10, 1982 <br />SUBJECT: LIFT STATION 13 AT EDGEWOOD DRIVE AND COUNTY ROAD I <br />On October 4, 1982, pump #1 motor in lift station #3 failed. Further <br />investigation during repair determined that the pump impellar slipped <br />on the pump shaft and bound up in the pump casing causing the motor <br />to burn out. The pump impellar was also damaged and required replace- <br />ment. These repairs cost approximately $1,100 for parts and motor <br />repair and approximately 12 manhours. Maintenance personnel are of <br />the opinion that pump #2 may soon require similar major maintenance. <br />This event prompted staff to review in a very preliminary fashion the <br />feasibility of eliminating lift station #3 similar to lift station #5 <br />on Quincy Street last year. The following data has been researched <br />(see attached sketch for lift station service area). <br />1) Lift station #3 was built in 1965. <br />2) Lift station #3 pumps an average of 6 to 10 hours per day at <br />550+ gallons per minute. <br />3) Annual electricity costs; 1980-$616.55, 1981•-So51.51, 1982 <br />(estimate)-$674.33. <br />4) Elevation of inlet to lift station is 882.0 and elevation <br />of bottom of wet well is 875.33. <br />5) Elevation of Metro Waste Control Commission 66 inch inter- <br />ceptor sewernear Edgewood Drive and Bronson Drive is 861.54. <br />6) Distance from lift station to Metro Waste Control Commission <br />sewer is 1100+ feet. <br />7) Preliminary construction cost estimate: <br />1100 feet of 12 or 15 inch sewer <br />25 feet deep <br />Pavement and sod restoration <br />New meter station <br />TOTAL <br />EngAncering <br />$120,000 - $145,000 <br />$50,000 - $65,000 <br />$25,000 - $36,000 <br />$195,000 - $246,000 <br />$29,000 - $37,000 <br />Staff requests direction from City Council as to whether to pursue a <br />more detailed feasibility study of phase out of lift station #3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.