Laserfiche WebLink
EZSLIST ?U'�'�LDFt4ERT PROPOSALS <br />iPACTED BY'L _2/�/48 <br />go LL of L .___ <br />06, Subd, 38Mould dredging have a significant ottect on the ecological or <br />hydrological characteristics of the wetlands? I <br />i <br />1) Mould dredginc be located so as to minimise any impact on ! <br />i <br />vegetation? <br />2) Mauld water flow charectar;Sfics be significantly changed? <br />V <br />3) Mould the drecged area be Iinited to the minimum required? <br />✓ <br />4) Mould disposal of dredged material within the wetland <br />i <br />toning district result In any of the effects listed below: <br />' <br />a) A significant change in the current flow r o pending, <br />b) A substantial destruction of vegetation or fish <br />spawning areas, <br />c) Substantial change In water pollution, <br />5) Mould any work in the watiand be perform during breediog <br />! <br />season of were, fowl or fish spauning season? <br />I ✓ <br />(6,Subd, 3C 1) Mould any sewage disposal system be located within 100 <br />1 <br />feet of the wetland? I <br />i <br />Mould disposal system meet the criteria as set our in <br />I <br />Minnesota Rule 6, MCAR 4,8040? <br />2) Mould any organic waste be discharged to a wetland? <br />)/ <br />3) Mould erosion control measures and retention facilities be <br />In place prior to the start of construction? ! <br />i <br />4) Mould sediment yield from construction be mare than 2 tons <br />per acre per year? <br />AjO — ALcoe JvN r, f <br />4P41c.tir <br />Yfs— ALLb'ZU,a/F To <br />A PPLIG n^/T <br />Na i <br />YES' ALL4C✓/N (^ rc <br />AOPu c�Nr <br />I <br />NO <br />pp <br />No <br />W.. <br />No <br />Yes <br />NO <br />