My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1983/12/08
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1983
>
Agenda Packets - 1983/12/08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 1:38:22 PM
Creation date
3/17/2025 11:31:36 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
12/8/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
("KDA <br />ENGINEERS ARCHITECTS PLANNERS <br />December 12, 1983 <br />Mr. John C. Johnson, P.E. <br />Director <br />Public Works/Community Development <br />City of Mounds View <br />2410 Highway 10 <br />Mounds View, Minnesota 55112 <br />Re: Mounds View Reservoir Inspection <br />Commission No. 8052-011 <br />Dear Mr. Johnson: <br />TOLTZ,XING DUVALL,ANDEOSON <br />AND ASSOCIATES. mconPORATED <br />28A AMEDICAN NATIONAL DANK BUILDING <br />SAINI PAUL. MINNE501 A 15101 <br />512,32 44DO <br />This is to confirm our conversation after we jointly inspected the Mounds <br />View Water Reservoir on December 9, 1983. <br />Based on our visual inspection of the reservoir, it is our opinion that <br />the reservoir is in very good structural condition, suitable for immediate <br />continued use for water storage. The minor spalling on the interior does <br />not in our opinion, affect the structural integrity of reservoir. <br />We would recommend that the reservoir be disenfected and re -filled immediately <br />to prevent thermal shock in the event the outside temperature drops. <br />Barring any unforeseen events, we would recommend that the reservoir be <br />drained and re -inspected in approximately five (5) years. <br />During our inspection we noticed the following remedial repairs which are <br />required on the reservoir exterior: <br />1. Brickwork. Missing bricks should be replaced this spring and entire - <br />sorr ace be repointed with weather -resistant mortar within the next few <br />years. <br />2. Flashing. Clean and re -caulk joint between flashing and concrete roof <br />slab. <br />3. Roof Expansion Joints. As soon as weather permits, roof slab expansion <br />joints should be thoroughly cleaned out and resealed with two part <br />polysulfide sealant. <br />If you have any questions on our investigation, please feel free to contact <br />our office. <br />Very truly yours, <br />TOLTZ, KING, DUVALL, ANDERSON <br />AND ASSOCIATES, INCORPORATED <br />een <br />G�i J. Be ty, P.E. <br />OJB/ll Minn. Reg. No. 6593 <br />cc: Mr. Pat Lehman <br />
The URL can be used to link to this page
Your browser does not support the video tag.