My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1984/03/26
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1984
>
Agenda Packets - 1984/03/26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 12:58:05 PM
Creation date
3/17/2025 2:19:52 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
3/26/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
March 27, 1984 <br />Page Two <br />to design and take bids by June. If Spring Lake Park does <br />proceed, we can add this project as an addendum later on this <br />summer. Please refer to the following table of potential M.S.A. <br />projects. 10 <br />POTENTIAL M.S.A. PROJECTS <br />Exist. Pavement Average Estimated <br />Classifi- Street Surface Daily Total <br />Street From To cation Width Stress Traffic Cost* <br />Edgewood Cc Rd H Co Rd H2 M.S.A. ' 42 ft. M20 1,400 $260,000 <br />Quincy Cc Rd I Hillview M.S.A. 42 ft. M10 --- $135,000 <br />Co Rd I Silver Lk Hwy 10 M.S.A. 24 ft. S30 --- $180,000 <br />Hillview Hwy 10 Jackson M.S.A. 42 ft. M20 --- --- <br />*Please refer to Section IV for a cost breakdown. <br />Constructing a road on Quincy from County Road I to Belle <br />lane will take additional time because the parking problems <br />in front of Pinewood school will need to be solved. The <br />perpendicular parking problems at the school could delay an <br />M.S.A. project in the area. <br />The storm sewer work on Edgewood, Quincy and County Road I <br />includes moving or replacing catch basins and their associated <br />lead pipes. The M.S.A. funds pay for 100% of this storm sewer <br />work. The storm sewer system on Hillview needs additional study <br />before an M.S.A. road is constructed. <br />IV. Proposed Improvements and Estimated Costs <br />The proposed improvements will meet M.S.A. requirements. The <br />estimated total costs are as follows: <br />ESTIMATED COST PER 1,000 FEET <br />Unit <br />Description Unit Price Quantity Total Price <br />4" thick bituminous (44' wide) Ton $ 26.00 1,100 S 28,600.00 <br />6" thick class 5 gravel (44' wide) Ton $ 6.00 1,700 $ 10,200.00 <br />Concrete curb and gutter L.F. $ 7.00 2,000 $ 14,000.00 <br />Adjust manholes E.A. $200.00 3 $ 600.00 <br />Adjust gate valve E.A. $200.00 3 $ 600.00 <br />Remove existing material C.Y. $ 20.00 1,400 $ 22,8004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.