My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1984/10/22
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1984
>
Agenda Packets - 1984/10/22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 2:22:54 PM
Creation date
3/19/2025 2:22:54 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/22/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
October 30, 1984 <br />Page Four <br />Proposed Schedule (cont.) <br />Advertise for Bids in New Brighton <br />Bulletin and Construction Bulletin <br />Televise Sewer Lines <br />Open Bids <br />Recommend Acceptance/Rejection Contingent <br />on City Attorney and M.S.A. Approval <br />March 4, 1985 <br />March 8, 1985 <br />April 12, 1985 <br />April 15, 1985 <br />Council Agenda <br />The City can hire a consultant to design the project or the <br />City can design the project in-house. The estimated cost of <br />hiring a cosultant to design, inspect and stake the project <br />is $36,800 ($230,000.00 x 16%). <br />If the City designed, inspected and staked the project we can <br />bill M.S.A for our costs. M.S.A. will pay these costs up to <br />16% of the construction cost of the project without <br />documentation. I can design the project and write the <br />specifications and Brian Hoffman can survey, draft and <br />inspect the project. <br />In summary, the existing staff can do a majority of the work, <br />however, we will need approval to do the following: <br />1. Conduct soil borings and soil <br />strength determination (Braun <br />Engineering), use the City <br />drill truck. Estimated Cost - $2,500.00 <br />2. A time and materials basis with <br />a Not to Exceed cost of $976.00 <br />(Please refer to attached letter <br />dated October 3, 1984) $ 976.00 <br />$3,476.00 <br />We believe that the City can save money by designing and <br />inspecting the project in-house. Staff believes that Quincy <br />Street from County Road H-2 to County Road I is a logical choice <br />for road reconstruction in 1985. Staff also believes that a <br />sidewalk should be installed on the east side of Quincy Street. <br />The sidewalk is funded completely with M.S.A. monies. <br />I <br />Staff has also analyzed the possibility of a 1986 M.S.A. project. <br />I expect to have a memo in the near future detailing the schedule <br />and costs for reconstructing Edgewood Drive from Highway 10 to <br />County Road I including solving storm sewer and sanitary sewer �./■ <br />problems. <br />SWT/be <br />
The URL can be used to link to this page
Your browser does not support the video tag.