Laserfiche WebLink
Clerk -Administrator and City Council <br />February 14, 1985 <br />Page Three of Three <br />a) If the City receives odor complaints, analyze other <br />options, including water treatment plant. <br />V. ESTIMATED COSTS AND OUOTES <br />1. Estimated well pump and motor maintenance cost = S16,800 <br />2. Electrical work: <br />a) Estimated control system replacement cost = $ 800 <br />b) Electrical replacement Ouote = $3,225 <br />(Attachment #2 is a copy of the quote from <br />Bacon Electric). <br />3. Chlorine and fluoride equipment Ouote = $2,060 <br />replacement (Attachment #3 is a quote <br />from Vessco) <br />4. Estimated water testing costs = $ 600 <br />5. Estimated chlorine (HTH brand) costs = $ 500 <br />6. Estimated flow meter maintenance cost = $ 800 <br />7. Estimated air release valve and piping = S 350 <br />replacement cost <br />8. Contingency = $2,500 <br />Estimated Well #4 Project Cost $27,635 <br />Use $28,000 <br />A second quote for electrical replacement was received from <br />Gopher Electric in the amount of $4,786.00. (Attachment #4 <br />is a copy of the quote.) <br />A second quote for chlorine and fluoride equipment <br />replacement was received from Water Co., Inc, in the amount <br />of $2,220.00. (Attachment #5 is a copy of the quote.) <br />VI. RECOMMENDATIONS <br />I recommend awarding the electrical replacement work to Bacon <br />Electric for $3,225.00, and awarding the chlorine and <br />fluoride equipment replacement work to Vessco for $2,060.00. <br />I recommend directing staff to advertise for bids on the well <br />pump and motor maintenance work and authorize staff to <br />proceed with the project as outlined in this memo. <br />SWT/bc <br />